Current capability table · retained S004 opening brief

S004: team participation and task continuation

The same capability table is updated from native Sidecat. Its original sprint agreement remains below for comparison.

S004’s main occurrence was reviewed and judged not completed. Closing disposition and retained evidence · Current S007 plan.

On this page

Current capability maturity

Evidence through Team 5897. Updated . 7 cells changed in this update; 170 exact changes are retained. Changed marks refer to this update. All sixteen full Version 1 outcomes remain incomplete.

Agents qualify documented installed boundaries and independently test them. Operator/client human qualification occurs after handoff and is not a completion prerequisite. A candidate, source publication and released default are reported separately.

Product capabilityCurrent progress and next work
Organizational context
Existing implementation or use
Installed prepared context is independently qualified for the tested six-export edition: an ordinary newcomer installs and explicitly adopts it, selects two owner inputs, creates Work/Plan and returns after reopen by task title. Exact original input pins survive omitted updates; source checks47/47 and installed pin checks11/11 passed.
Missing qualification or material gap
This qualification covers the prepared context edition, not all organizational context. Native scope membership, read-without-revise, native Plan repin/supersedes, broader inheritance and the public default remain open.
Sprint disposition
Integrate the accepted context edition with Cedar's Node successors. Continue the broader context and semantic responsibilities without repeating completed trials unless changed behavior requires it.
Identity, authority and resources
Existing implementation or use
Prepared actors and owner access controls are used. Exact child-mission source passes 34 Auth cases; allowance 38, Begin/revoke 46 and settlement 67 pass in successive owner suites.
Missing qualification or material gap
Authority components pass owner suites, but the common authority facade had five failing behaviors in the later source trial. Installed guarded effects, delegation and opt-in governance still need complete qualification.
Sprint disposition
Authority engineer owns the remaining token/executor path. Root integrates qualified successors and judges actual installed authorized effects.
Records and source references
Existing implementation or use
S006 exercised an exact 876-character originating Note. S007 now captures distinct originals; an assisted installed CLI participant deliberately selected, read and restored the correct 1,518-character original. Independent readback confirmed the bound task, source, title and full text.
Missing qualification or material gap
Full-area qualification remains incomplete. The S007 CLI sample used an existing prepared actor and assistance; both-lot controls, ordinary reconnected MCP/Lisp and production UI participant acceptance remain open.
Sprint disposition
Retain the exercised original-read and restore evidence. Complete the selected S007 ordinary-use controls and remaining surfaces before judgment; no full V1-03 completion.
Work and planning
Existing implementation or use · Changed
The earlier Note/Work/Plan/progress/share and reconnect workflows remain exercised. Installed opt-in Plan completion is independently qualified with genuine Notes and three authenticated actors. The extension verifies producer, binder and reviewer scope, a deliberately selected new occurrence for a changed candidate, rejection of previous approval, and preserved accepted detail. Ordinary unbound completion remains available; fresh CLI and MCP detail agree.
Missing qualification or material gap · Changed
Kernel project/Work and application Plan coherence, unfamiliar participant discovery and evidence preparation without routine ID plumbing, actual scrum capability-analysis enrollment, successor activation and worker disposition remain incomplete. Candidate renewal uses a new occurrence of the same Work; in-place candidate rebinding is intentionally refused. The qualified completion mechanism is not yet a public default delivery.
Sprint disposition · Changed
Root owns integration and qualification. The original 49 behavioral assertions within141 checks stand. Team5897 records an independently accepted extension:29 behavioral assertions,29 successful calls and16 fresh scope/contract checks. Seven actual refusals were inspected. Broader governance Plan remains underway and unjudged; enrollment stays optional and human qualification is outside agent delivery.
Collective messaging
Existing implementation or use
Real room messages, shared content and bounded reads are used.
Missing qualification or material gap
Ordinary collaborator discovery and reply remain incomplete. The CLI newcomer cannot find a colleague through message targets or current-session participants; no colleague feedback is obtained.
Sprint disposition
Human-and-agent team participation selected.
Lisp and composition
Existing implementation or use
Explicit installed package-library adoption is independently qualified for the prepared six-export edition. Ordinary install/adopt/find/do/reopen/title-return passed3 selection/return and16 final assertions; all four adoption roots and seven supplemental owner refusal/origin outcomes passed the completed daemon traversal.
Missing qualification or material gap
General heterogeneous composition, macro/unsupported capture adoption and per-value public origin remain unfinished. Native Records/stock effects and default-release delivery are open. The completed daemon traversal has three receiving-grant failures and two unqualified skips; it is not whole-suite GREEN.
Sprint disposition
Codex semantic product lead owns package adoption, scoped context and prepared composition, with a Node consumer review from Cedar. Preserve S005/S006 evidence and complete S007 ordinary entry.
Marketplace and packages
Existing implementation or use
The prepared context package is accepted as a usable installed capability: ten resources, sixteen owner schema documents and six exports support independent normal installation, explicit adoption and useful execution/reopen. Combined package source e59563a138096736d1678cbb734a95634ce27249 preserves both reviewed heads and matches exact tree5cff10c0477943314c8996bea96d9bdcc9d59194.
Missing qualification or material gap
The qualified prepared edition is not yet a published default. Wider marketplace publication/discovery/replacement and other package lifecycles remain unfinished. Cedar owns the combined Node/package delivery; acceptance of this edition does not qualify all packages.
Sprint disposition · Changed
Codex owns semantic package adoption and composition. Cedar now owns the complete packages and marketplace area under native assigned Work/Plan (Team5881/5897): publication, discovery, inspection, installation/use, replacement and self-hosted access. The existing packages-fix lane leads authoring, with independent QA within its current worker/resource cap. Cedar acknowledgement and new implementation evidence are not yet established. Codex B remains off.
Semantic engine
Existing implementation or use · Changed
Prepared context/package use and supplied-source semantic assessment are independently qualified within their documented boundaries. Installed assessment0.4.1 adds an ordinary named receiving-policy preview: explicitly selected finite mapping converts recorded5000 grams into the exact draft text 'Recorded net carton mass: 5 kilograms.' Missing mapping rows and undeclared conversions remain blocked or unknown. Genuine Content source reads and authored annotations are preserved.
Missing qualification or material gap · Changed
Assessment qualification uses genuine Content declarations, closure and reads with QA-authored policy/schema/vocabulary inputs. The new conversion is a declared finite mapping, not general arithmetic, physical measurement or a Records/action effect. Engine and Guide source successors are published; integrated Core, retained callers, complete S007 CLI/UI, broader composition and matched public default delivery remain incomplete.
Sprint disposition · Changed
The semantic owner and two children continue the selected command-analysis increment: compare observed and alternative bindings against declared task meaning and explain preserved, lost and unknown criteria. Installed quantity0.4.1 was independently accepted at Team5852 and raw results reviewed by Root. Cedar5859 reports exact Engine/Guide source publication; Core0.4.1 remains a Node integration input. Team5860/5896 select the next increment without replacing S007 or claiming installed Compare.
Executable procedures
Existing implementation or use
Unknown-outcome, cancellation/retry and pending-retry repairs are integrated. Later stopped-observation source passes 80 selected owner tests; four integrated unknown/known/canceled/interrupted controls pass.
Missing qualification or material gap
Native cancellation/retry routes remain missing in the separate owner trial. Its latest run also has a temporary-socket setup failure in one old control, so it is not clean RED. Full waits, recovery and installed procedure use remain open.
Sprint disposition
Orchestration engineer owns native routing and recovery; integration keeps actual uncertainty and stopped outcomes separate from success.
Managed agent work
Existing implementation or use
Earlier manager/child source evidence remains. A later real child-process source trial passed application Plan and RolesAssignment handoff, immutable-context checks and completion recording; process exit is kept distinct from actual Plan completion.
Missing qualification or material gap
The Plan bridge source evidence is not complete installed managed work. Cross-harness returns, current-principal authority, cancellation/retry and restart recovery need integrated user-path qualification.
Sprint disposition
Root retains integration responsibility and coordinates the Node owner and remote-execution owner for installed managed work.
Controlled execution
Existing implementation or use
A serialized capped remote builder performs source-matched Go/Rust/site checks and builds, with retained commands, exits and unchanged-source checks.
Missing qualification or material gap
That build path does not qualify general controlled local/remote execution, cancellation, connector effects or actionable unknown outcomes. The protected-material failure required private reconstruction of owner setup; general actionable prerequisite discovery and supported repair/request remain unqualified (Team5159/5162).
Sprint disposition
Reuse the accepted builder. Keep unknown effects untouched; do not infer a general execution qualification from component build passes.
Shared bus and federation
Existing implementation or use
Local typed owner calls remain installed. Cedar's fresh-node federation trial executed commands from one node on another. Linden reports completed subscription, local two-node and route-reselection runs; a separate bus check failed.
Missing qualification or material gap
Cross-node Work dispatch failed in the fresh-node trial; successor nodes are prepared but its final demonstration is pending. Local bus runs do not establish independently administered-node recovery or full durable subscription behavior.
Sprint disposition
Linden owns local bus and application coordination; Aspen owns federation and remote execution. Cedar is transferring its existing federation work after one bounded demonstration. Each owner retains its own full development and QA cycle.
Feedback and improvement
Existing implementation or use
Native findings and independent participant reports are retained unchanged. Current trials expose collaboration, documentation, orientation and output friction. A separate helper probe returns structured criticism advice with zero tool events.
Missing qualification or material gap
The helper probe is backend feasibility, not installed UI or automatic priority change. Complete feedback intake, comparable task costs, useful independent QA and accepted improvement delivery remain unfinished.
Sprint disposition
Cedar owns the responsive operator interface and retained feedback intake alongside Node. Root aligns priorities and release decisions. The separate QA guide has a first research unit; it is not yet a usable manual or completed QA cycle.
Usable interfaces and integrations
Existing implementation or use
Prepared CLI/MCP/Lisp use remains exercised. The context edition's ordinary installation, returned adoption, default dispatcher/direct parity and CLI/MCP/Lisp return checks passed on an isolated candidate. Cedar's reconciled installer successor d9b05560c and round2 REPL/package journeys are under independent review; earlier Ubuntu evidence remains.
Missing qualification or material gap
Installer, REPL/package successors and the semantic candidate remain unpublished as a matched default. Full daemon/CLI/surface traversal is incomplete; coherent public help/manual/package behavior, macOS and broader integrations remain open. Finite parity checks do not qualify the full command surface.
Sprint disposition
Cedar owns Node/CLI, installer and fresh-node REPL/package trials; Codex owns semantic/common-task integration and release review. Codex B is off.
Operational durability and scale
Existing implementation or use
Retained records survive earlier node reconnect trials. After a real desktop out-of-memory interruption at19:01 MDT, the heartbeat restored Root's original thread at19:15. Root then manually resumed Claude, Grok and Cursor from retained conversations; completed remote jobs were not replayed.
Missing qualification or material gap
Root's original-thread recovery is observed, but other primary recovery required manual action. The existing monitor detected federation idle for ten checks without acting; a guarded owner-wake correction is assigned, not delivered. Whole-team recovery, verified backup restore, contention and scale remain unfinished.
Sprint disposition
Cedar retains recovery engineering and Node durability; Aspen owns the hourly coordination reminder. Root monitors resources and qualifies recovery behavior. Existing S007 restoration and broader durability obligations remain.
Sidecat UI
Existing implementation or use
Earlier finite S007 retained-source/UI evidence stands. A new published Boards build passed its source gates but dropped five installed retained-source behaviors. Cedar restored the prior default at21:59MDT; the new build remains side by side. Three-way merge and independent installed retest are underway.
Missing qualification or material gap
The UI regression omitted displayed-proposal binding/refusal, task-change context clearing, Shift input, task breadcrumb and footer. Their unpublished predecessor source must be merged and published with Boards. Broader responsiveness, feedback, conversation, authorized decisions and useful current usage remain unqualified.
Sprint disposition
Cedar owns Node/UI together and is merging the exact S007 predecessor with published Boards, preserving unrelated owner work. Ship and test the resulting matched source/default; source gates alone do not qualify the operator path.

Qualified installed boundaries

These bounded workflows are Qualified. Their limits and remaining delivery are explicit; they do not promote an entire product area.

  • Install and explicitly adopt a prepared context package, perform useful work and recover exact pinned inputs by task title

    Tested resource-only six-export edition on the isolated installed candidate; no claim of full semantic engine, general marketplace or public default delivery.

    3 selection/return checks,16 final assertions,11 installed pin checks; four adoption roots and seven supplemental outcomes in completed review07

    Remaining delivery: Cedar combined Node/package publication and matched default installation

  • Assess supplied source meanings, mappings and constraints, inspect uncertainty and recover permitted originals

    Installed assessment0.4.1 with an ordinary named receiving-policy entry and genuine Content source reads. Explicit finite mapping previews5000 grams as5 kilograms;6000 has no declared row and remains incomplete, and direct5000 without mapping remains incompatible. This does not qualify general arithmetic, physical measurement, Records/action effects, complete S007/UI or default release.

    38/38 independent assertions over 68 original receipts; transport parity, exact branches, explicit mappings, ambiguity, absent semantics, negative inputs, cached denial and reopen checked; owner independently reviewed the returned manifest. Extension: independently inspected compiled Engine controls and actual ordinary named-policy, missing-row and direct-check replies; Root verified20 raw files against the manifest and the production diff.

    Remaining delivery: Integrated Node/Core0.4.1, retained caller replacement and matched public default delivery; wider semantic responsibilities remain active.

  • Enroll a Plan in optional completion requirements, evaluate real evidence and authorized review, and complete or explicitly waive with preserved accepted detail

    Controlled installed journey with genuine Notes and three distinct authenticated actors; source and actual replies independently reviewed. Extended candidate and actor scope are qualified using a deliberately selected new Plan occurrence of the same Work, not in-place rebinding. No claim of unfamiliar participant discovery, external-shell enforcement or public/default delivery.

    49 behavioral assertions in 141 checks; separate actor scopes, reviewer approval, missing/stale/refused/unknown/not_run/failed cases, explicit waiver, unbound control and fresh CLI/MCP parity. Independent reviewer inspected raw results and final supplement. Extension:29 behavioral assertions,29 successful calls and16 fresh scope/contract checks; actual wrong producer/binder/reviewer, changed-policy, previous-observation and previous-approval refusals inspected. Previous occurrence remains not_completed; new authorized approval completes only the new occurrence.

    Remaining delivery: Broader governance acceptance scenarios and ordinary participant preparation; matched Node/public default release

Exact changed-cell history

The original sixteen-row baseline and all 170 before/after changes remain in the structured download.

2026-10-10T13:12:51.334947654Z · 7 changed cells

Extend two qualified installed capabilities; assign complete marketplace ownership without claiming acknowledgement or implementation

  1. Work and planning · Existing implementation or use
    Before
    The earlier Note/Work/Plan/progress/share and reconnect workflows remain exercised. Installed opt-in Plan completion is independently qualified with genuine Notes and three authenticated actors: requirements, reviewer approval, current-access staleness, preserved accepted detail and explicit waiver. Ordinary unbound completion remains available; fresh CLI and MCP detail agree.
    After
    The earlier Note/Work/Plan/progress/share and reconnect workflows remain exercised. Installed opt-in Plan completion is independently qualified with genuine Notes and three authenticated actors. The extension verifies producer, binder and reviewer scope, a deliberately selected new occurrence for a changed candidate, rejection of previous approval, and preserved accepted detail. Ordinary unbound completion remains available; fresh CLI and MCP detail agree.
    Evidence
    Team5897
  2. Work and planning · Missing qualification or material gap
    Before
    Kernel project/Work and application Plan coherence, unfamiliar participant discovery and evidence preparation without routine ID plumbing, remaining policy/candidate scope scenarios, actual scrum capability-analysis enrollment, successor activation and worker disposition remain incomplete. The qualified installed completion mechanism is not yet a public default delivery.
    After
    Kernel project/Work and application Plan coherence, unfamiliar participant discovery and evidence preparation without routine ID plumbing, actual scrum capability-analysis enrollment, successor activation and worker disposition remain incomplete. Candidate renewal uses a new occurrence of the same Work; in-place candidate rebinding is intentionally refused. The qualified completion mechanism is not yet a public default delivery.
    Evidence
    Team5897
  3. Work and planning · Sprint disposition
    Before
    Root owns integration and qualification. Team5797 accepts the controlled installed completion workflow after independent review: 49 behavioral assertions within 141 checks, with setup and transport counted separately. Broader governance Plan remains underway and unjudged. Keep enrollment optional; human qualification is outside agent delivery.
    After
    Root owns integration and qualification. The original 49 behavioral assertions within141 checks stand. Team5897 records an independently accepted extension:29 behavioral assertions,29 successful calls and16 fresh scope/contract checks. Seven actual refusals were inspected. Broader governance Plan remains underway and unjudged; enrollment stays optional and human qualification is outside agent delivery.
    Evidence
    Team5897
  4. Semantic engine · Existing implementation or use
    Before
    Two installed workflows are independently qualified: prepared context/package use and supplied-source semantic assessment 0.4. The latter assesses exact source branches, typed meanings, mappings, annotations and constraints; CLI, MCP/Lisp and direct Check agree. Undeclared meaning stays unknown, ambiguity remains visible and denied original reads remain denied after cached return.
    After
    Prepared context/package use and supplied-source semantic assessment are independently qualified within their documented boundaries. Installed assessment0.4.1 adds an ordinary named receiving-policy preview: explicitly selected finite mapping converts recorded5000 grams into the exact draft text 'Recorded net carton mass: 5 kilograms.' Missing mapping rows and undeclared conversions remain blocked or unknown. Genuine Content source reads and authored annotations are preserved.
    Evidence
    Team5852, Team5859, Team5860, Team5896, Team5897
  5. Semantic engine · Missing qualification or material gap
    Before
    Assessment 0.4 qualification uses genuine Content declarations, closure and reads with QA-authored lot/policy/vocabulary/mapping inputs. Inherited meaning-source integration, retained caller replacement, publication/adoption of meaning catalogs, wider heterogeneous composition, native Records, complete S007 UI and public default delivery remain incomplete.
    After
    Assessment qualification uses genuine Content declarations, closure and reads with QA-authored policy/schema/vocabulary inputs. The new conversion is a declared finite mapping, not general arithmetic, physical measurement or a Records/action effect. Engine and Guide source successors are published; integrated Core, retained callers, complete S007 CLI/UI, broader composition and matched public default delivery remain incomplete.
    Evidence
    Team5852, Team5859, Team5860, Team5896, Team5897
  6. Semantic engine · Sprint disposition
    Before
    Semantic owner accepted installed assessment 0.4 at Team5747 after 38/38 independent assertions over 68 receipts and separate owner checks. Cedar can integrate reviewed source b4f4f8d4addff4b28131dd2f6439b8b1a32300f4 and its bundle without another permission gate. Two semantic children continue retained-caller review and inherited meaning-source integration. Earlier review07 had 1041 passing roots and three receiving-grant failures; source repair is separate from installed/default qualification.
    After
    The semantic owner and two children continue the selected command-analysis increment: compare observed and alternative bindings against declared task meaning and explain preserved, lost and unknown criteria. Installed quantity0.4.1 was independently accepted at Team5852 and raw results reviewed by Root. Cedar5859 reports exact Engine/Guide source publication; Core0.4.1 remains a Node integration input. Team5860/5896 select the next increment without replacing S007 or claiming installed Compare.
    Evidence
    Team5852, Team5859, Team5860, Team5896, Team5897
  7. Marketplace and packages · Sprint disposition
    Before
    Codex owns semantic package adoption and composition; Cedar owns Node package integration and the fresh-node package trial. Codex B is off.
    After
    Codex owns semantic package adoption and composition. Cedar now owns the complete packages and marketplace area under native assigned Work/Plan (Team5881/5897): publication, discovery, inspection, installation/use, replacement and self-hosted access. The existing packages-fix lane leads authoring, with independent QA within its current worker/resource cap. Cedar acknowledgement and new implementation evidence are not yet established. Codex B remains off.
    Evidence
    Team5881, Team5897
2026-10-10T10:05:29.336Z · 3 changed cells

Third bounded installed capability: opt-in completion independently qualified; broader governance and default delivery remain incomplete

  1. Work and planning · Existing implementation or use
    Before
    The earlier isolated Note/Work/Plan/progress/share task and distinct-reader reconnect remain exercised. The successor combines Work predecessor recovery and opt-in completion policy: 77 integrated Work events pass. A CLI newcomer retains a practical unreviewed Work result; MCP creates and updates an ordinary project and Work.
    After
    The earlier Note/Work/Plan/progress/share and reconnect workflows remain exercised. Installed opt-in Plan completion is independently qualified with genuine Notes and three authenticated actors: requirements, reviewer approval, current-access staleness, preserved accepted detail and explicit waiver. Ordinary unbound completion remains available; fresh CLI and MCP detail agree.
    Evidence
    Team5797
  2. Work and planning · Missing qualification or material gap
    Before
    Kernel project/Work and application Plan coherence remains incomplete. Newcomer collaboration fails at missing target/session discovery. Full independent completion-policy, successor activation and worker-disposition journeys are still open.
    After
    Kernel project/Work and application Plan coherence, unfamiliar participant discovery and evidence preparation without routine ID plumbing, remaining policy/candidate scope scenarios, actual scrum capability-analysis enrollment, successor activation and worker disposition remain incomplete. The qualified installed completion mechanism is not yet a public default delivery.
    Evidence
    Team5797
  3. Work and planning · Sprint disposition
    Before
    Root owns integration and qualification. Preserve exact retired offers and attempts; keep evidence optional by default. Current participant trials are finite observations, not S007 or full-area completion.
    After
    Root owns integration and qualification. Team5797 accepts the controlled installed completion workflow after independent review: 49 behavioral assertions within 141 checks, with setup and transport counted separately. Broader governance Plan remains underway and unjudged. Keep enrollment optional; human qualification is outside agent delivery.
    Evidence
    Team5797
2026-10-10T08:13:49.236Z · 3 changed cells

Second independently qualified installed capability accepted at Team5747; wider engine and default delivery remain incomplete

  1. Semantic engine · Existing implementation or use
    Before
    The engine and assessment host support a qualified prepared context/package workflow: actual owner descriptors and schemas, plain-language task discovery, context execution and exact title-based return. Keep this useful capability distinct from the full semantic engine's wider meaning/type/relation, mapping, analysis and composition responsibilities.
    After
    Two installed workflows are independently qualified: prepared context/package use and supplied-source semantic assessment 0.4. The latter assesses exact source branches, typed meanings, mappings, annotations and constraints; CLI, MCP/Lisp and direct Check agree. Undeclared meaning stays unknown, ambiguity remains visible and denied original reads remain denied after cached return.
    Evidence
    Team5747
  2. Semantic engine · Missing qualification or material gap
    Before
    The tested context/composition path is exercised. Full meaning/type/relation publication and adoption, mapping catalogs, heterogeneous assessment and explanation remain incomplete. Broad collection misclassifies source-declared names absent from a smaller node's application list; Team5678 corrects the earlier false-advertisement attribution. Native Records, complete S007 UI and public default delivery remain open.
    After
    Assessment 0.4 qualification uses genuine Content declarations, closure and reads with QA-authored lot/policy/vocabulary/mapping inputs. Inherited meaning-source integration, retained caller replacement, publication/adoption of meaning catalogs, wider heterogeneous composition, native Records, complete S007 UI and public default delivery remain incomplete.
    Evidence
    Team5747
  3. Semantic engine · Sprint disposition
    Before
    Semantic lead retains full engine ownership with two active children. Terminal review07:1041 passed top-level roots, three organization-read receiving-grant failures, two unqualified skips and no timeout/unfinished cases. All adoption roots passed. The three failures reproduce on untouched ef49; Cedar/Aspen own repair. Combined Node and public default delivery remain pending.
    After
    Semantic owner accepted installed assessment 0.4 at Team5747 after 38/38 independent assertions over 68 receipts and separate owner checks. Cedar can integrate reviewed source b4f4f8d4addff4b28131dd2f6439b8b1a32300f4 and its bundle without another permission gate. Two semantic children continue retained-caller review and inherited meaning-source integration. Earlier review07 had 1041 passing roots and three receiving-grant failures; source repair is separate from installed/default qualification.
    Evidence
    Team5747
2026-10-10T05:53:15.444Z · 9 changed cells

Native installed capability acceptance and terminal daemon evidence through Team5714; human qualification is outside agent completion scope

  1. Organizational context · Existing implementation or use
    Before
    Guidance, references and roles are used. An independent newcomer installed a prepared context edition, selected two actual owner inputs, created Work/Plan and reopened the same original versions by a human task title. Ordinary views kept identifiers internal. Context controls passed22/22; the repaired pin path passed11/11 installed checks.
    After
    Installed prepared context is independently qualified for the tested six-export edition: an ordinary newcomer installs and explicitly adopts it, selects two owner inputs, creates Work/Plan and returns after reopen by task title. Exact original input pins survive omitted updates; source checks47/47 and installed pin checks11/11 passed.
    Evidence
    Team5684, Team5696, Team5712, Team5714
  2. Organizational context · Missing qualification or material gap
    Before
    The finite context journey is exercised on an isolated candidate. Native scope membership, read-without-revise and native Plan repin/supersedes remain open; public default availability and wider inheritance need integrated qualification.
    After
    This qualification covers the prepared context edition, not all organizational context. Native scope membership, read-without-revise, native Plan repin/supersedes, broader inheritance and the public default remain open.
    Evidence
    Team5684, Team5696, Team5712, Team5714
  3. Organizational context · Sprint disposition
    Before
    The semantic owner continues full context and engine work. Integrate the usable prepared edition and finish the selected S007 whole-task/UI return; completed newcomer checks recur only when a relevant change warrants it.
    After
    Integrate the accepted context edition with Cedar's Node successors. Continue the broader context and semantic responsibilities without repeating completed trials unless changed behavior requires it.
    Evidence
    Team5684, Team5696, Team5712, Team5714
  4. Lisp and composition · Existing implementation or use
    Before
    Earlier retained-helper evidence stands. Core78b4b655 lets a resource-only package return its literal adoption command and expose six exports in default main. Independent useful execution and exact source reopen passed3/3 return checks and16/16 final assertions. A separate actual mixed library trial preserved scratch while adopting four request maps and two methods.
    After
    Explicit installed package-library adoption is independently qualified for the prepared six-export edition. Ordinary install/adopt/find/do/reopen/title-return passed3 selection/return and16 final assertions; all four adoption roots and seven supplemental owner refusal/origin outcomes passed the completed daemon traversal.
    Evidence
    Team5684, Team5696, Team5712, Team5714
  5. Lisp and composition · Missing qualification or material gap
    Before
    Ordinary adoption works for the tested six-export edition. General heterogeneous composition, macro/unsupported capture adoption and per-value public origin remain unfinished. The mixed pantry trial is resource-only; native Records/stock effects, full SDK traversal and public release remain open.
    After
    General heterogeneous composition, macro/unsupported capture adoption and per-value public origin remain unfinished. Native Records/stock effects and default-release delivery are open. The completed daemon traversal has three receiving-grant failures and two unqualified skips; it is not whole-suite GREEN.
    Evidence
    Team5684, Team5696, Team5712, Team5714
  6. Marketplace and packages · Existing implementation or use
    Before
    Earlier helper and six-app candidate install evidence stands. A genuine prepared context package with ten resources, sixteen owner schema documents and six exports passes independent ordinary install, returned adoption and useful execution/reopen. Cedar's separate marketplace/package repairs remain local and are in round2 qualification.
    After
    The prepared context package is accepted as a usable installed capability: ten resources, sixteen owner schema documents and six exports support independent normal installation, explicit adoption and useful execution/reopen. Combined package source e59563a138096736d1678cbb734a95634ce27249 preserves both reviewed heads and matches exact tree5cff10c0477943314c8996bea96d9bdcc9d59194.
    Evidence
    Team5684, Team5696, Team5712, Team5714
  7. Marketplace and packages · Missing qualification or material gap
    Before
    The exercised prepared edition and Node repairs are not a published default release. Wider marketplace publication/discovery/replacement lifecycle and independent complete package use remain unfinished; the finite context-package result does not qualify all packages.
    After
    The qualified prepared edition is not yet a published default. Wider marketplace publication/discovery/replacement and other package lifecycles remain unfinished. Cedar owns the combined Node/package delivery; acceptance of this edition does not qualify all packages.
    Evidence
    Team5684, Team5696, Team5712, Team5714
  8. Semantic engine · Existing implementation or use
    Before
    The engine and read-only assessment host exist. A genuine catalog/prepared edition carries actual assessment0.3 owner descriptors, schemas and context methods. Independent ordinary install/adoption, plain-language discovery, context execution and title-based source return passed. Pin preservation passes47 source and11 installed cases; kept source changes only with explicit adoption.
    After
    The engine and assessment host support a qualified prepared context/package workflow: actual owner descriptors and schemas, plain-language task discovery, context execution and exact title-based return. Keep this useful capability distinct from the full semantic engine's wider meaning/type/relation, mapping, analysis and composition responsibilities.
    Evidence
    Team5684, Team5696, Team5712, Team5714
  9. Semantic engine · Sprint disposition
    Before
    Codex's semantic product lead owns the full engine area with two author/independent-test children. The first installed context edition passed; integrate the exact candidate with Cedar's Node successors and continue broader domain composition. Full remote traversal has no terminal whole-suite verdict yet.
    After
    Semantic lead retains full engine ownership with two active children. Terminal review07:1041 passed top-level roots, three organization-read receiving-grant failures, two unqualified skips and no timeout/unfinished cases. All adoption roots passed. The three failures reproduce on untouched ef49; Cedar/Aspen own repair. Combined Node and public default delivery remain pending.
    Evidence
    Team5684, Team5696, Team5712, Team5714
2026-10-10T04:32:35.434Z · 16 changed cells

Ordinary installed context/package journey and actual UI rollback; no full-outcome promotion or release-scope change

  1. Organizational context · Existing implementation or use
    Before
    Guidance, named references and roles are used. An isolated newcomer receives a prepared identity and ordinary organization; MCP orientation and project/Work use are observed.
    After
    Guidance, references and roles are used. An independent newcomer installed a prepared context edition, selected two actual owner inputs, created Work/Plan and reopened the same original versions by a human task title. Ordinary views kept identifiers internal. Context controls passed22/22; the repaired pin path passed11/11 installed checks.
    Evidence
    Team5677, Team5684
  2. Organizational context · Missing qualification or material gap
    Before
    Prepared orientation works, but scoped inheritance and ordinary package adoption remain unfinished. The organization-context library exists in source; its retained owner suite was failing at the previous handoff. An isolated successor is under repair.
    After
    The finite context journey is exercised on an isolated candidate. Native scope membership, read-without-revise and native Plan repin/supersedes remain open; public default availability and wider inheritance need integrated qualification.
    Evidence
    Team5684
  3. Organizational context · Sprint disposition
    Before
    Improve the context needed for task continuation.
    After
    The semantic owner continues full context and engine work. Integrate the usable prepared edition and finish the selected S007 whole-task/UI return; completed newcomer checks recur only when a relevant change warrants it.
    Evidence
    Team5684
  4. Lisp and composition · Existing implementation or use
    Before
    Installed helper 0.1.1 loads explicitly into a named Lisp environment with zero owner calls. Assignment/progress/sharing and fresh Lisp/MCP reads preserve exact Notes and Plan; prior S005/S006 evidence stands.
    After
    Earlier retained-helper evidence stands. Core78b4b655 lets a resource-only package return its literal adoption command and expose six exports in default main. Independent useful execution and exact source reopen passed3/3 return checks and16/16 final assertions. A separate actual mixed library trial preserved scratch while adopting four request maps and two methods.
    Evidence
    Team5684
  5. Lisp and composition · Missing qualification or material gap
    Before
    Ordinary resource-only package installation does not make its Lisp methods available. Existing trials used explicit private preparation; the selected repair extends existing REPL adoption, with context as its first consumer. General prepared composition remains unfinished.
    After
    Ordinary adoption works for the tested six-export edition. General heterogeneous composition, macro/unsupported capture adoption and per-value public origin remain unfinished. The mixed pantry trial is resource-only; native Records/stock effects, full SDK traversal and public release remain open.
    Evidence
    Team5684
  6. Marketplace and packages · Existing implementation or use
    Before
    Earlier helper install/adoption remains exercised. Later isolated rc3 builds passed 13 artifact stages and installed six application bundles; 151 authored documentation files plus an index were checked. Cedar's fresh-node package trial found and repaired an empty-index response in source; its rebuilt candidate awaits installed use.
    After
    Earlier helper and six-app candidate install evidence stands. A genuine prepared context package with ten resources, sixteen owner schema documents and six exports passes independent ordinary install, returned adoption and useful execution/reopen. Cedar's separate marketplace/package repairs remain local and are in round2 qualification.
    Evidence
    Team5682, Team5684
  7. Marketplace and packages · Missing qualification or material gap
    Before
    The integrated candidate and current repairs are unpublished. Marketplace lifecycle, resource-only library adoption and independent complete package use remain unfinished; new installed proof must follow the source repairs.
    After
    The exercised prepared edition and Node repairs are not a published default release. Wider marketplace publication/discovery/replacement lifecycle and independent complete package use remain unfinished; the finite context-package result does not qualify all packages.
    Evidence
    Team5682, Team5684
  8. Semantic engine · Existing implementation or use
    Before
    The standalone engine and read-only semantic assessment host are implemented. Host 0.2.0 is installed; actual Find ambiguity/single-source and selected-source Check controls were observed. S006 exercised one real original-source selection/read.
    After
    The engine and read-only assessment host exist. A genuine catalog/prepared edition carries actual assessment0.3 owner descriptors, schemas and context methods. Independent ordinary install/adoption, plain-language discovery, context execution and title-based source return passed. Pin preservation passes47 source and11 installed cases; kept source changes only with explicit adoption.
    Evidence
    Team5677, Team5684
  9. Semantic engine · Missing qualification or material gap
    Before
    Ordinary installation still lacks usable adoption of the context/discovery libraries, and capability catalog assembly needs repair. Meaning, types and relations, mapping, scoped context, prepared composition, assessment/explanation and discovery remain the full intended engine scope; none is waived by a narrow discovery result.
    After
    The tested context/composition path is exercised. Full meaning/type/relation publication and adoption, mapping catalogs, heterogeneous assessment and explanation remain incomplete. Broad collection misclassifies source-declared names absent from a smaller node's application list; Team5678 corrects the earlier false-advertisement attribution. Native Records, complete S007 UI and public default delivery remain open.
    Evidence
    Team5678, Team5684
  10. Semantic engine · Sprint disposition
    Before
    Codex semantic product lead owns the full engine area. First delivery joins existing context/library code to ordinary installed adoption, followed by prepared domain tasks and independent qualification; Cedar reviews the Node boundary.
    After
    Codex's semantic product lead owns the full engine area with two author/independent-test children. The first installed context edition passed; integrate the exact candidate with Cedar's Node successors and continue broader domain composition. Full remote traversal has no terminal whole-suite verdict yet.
    Evidence
    Team5684, Team5688
  11. Usable interfaces and integrations · Existing implementation or use
    Before
    Prepared CLI/MCP/Lisp use remains exercised. rc3 includes installed authored documentation. Cedar's installer repair passed 99 source tests and a fresh Ubuntu installation, rerun, root refusal and restart. Fresh-node REPL/package trials have additional source fixes and are still running.
    After
    Prepared CLI/MCP/Lisp use remains exercised. The context edition's ordinary installation, returned adoption, default dispatcher/direct parity and CLI/MCP/Lisp return checks passed on an isolated candidate. Cedar's reconciled installer successor d9b05560c and round2 REPL/package journeys are under independent review; earlier Ubuntu evidence remains.
    Evidence
    Team5682, Team5684
  12. Usable interfaces and integrations · Missing qualification or material gap
    Before
    Installer and later journey repairs are not published; macOS validation and release/documentation version consistency remain open. Actual MCP input-schema and marketplace reference failures were identified. Installed package adoption and coherent ordinary use remain unfinished.
    After
    Installer, REPL/package successors and the semantic candidate remain unpublished as a matched default. Full daemon/CLI/surface traversal is incomplete; coherent public help/manual/package behavior, macOS and broader integrations remain open. Finite parity checks do not qualify the full command surface.
    Evidence
    Team5682, Team5684
  13. Operational durability and scale · Missing qualification or material gap
    Before
    Root restart is observed, but the other primary harnesses required manual recovery. Whole-team automatic recovery, backup restoration, contention and target-scale qualification remain unfinished. Resource pressure caused a real interruption.
    After
    Root's original-thread recovery is observed, but other primary recovery required manual action. The existing monitor detected federation idle for ten checks without acting; a guarded owner-wake correction is assigned, not delivered. Whole-team recovery, verified backup restore, contention and scale remain unfinished.
    Evidence
    Team5682, Team5686, Team5688
  14. Sidecat UI · Existing implementation or use
    Before
    Installed UI73fd6b52/gateway47cc6535 exercised the selected S007 task: capital context input and first query character were retained; three viewport captures matched the complete1518-character original after viewport normalization; same-task Back/reopen retained it. Switching tasks cleared the old source and the earlier lot stayed honestly missing/invalidated.
    After
    Earlier finite S007 retained-source/UI evidence stands. A new published Boards build passed its source gates but dropped five installed retained-source behaviors. Cedar restored the prior default at21:59MDT; the new build remains side by side. Three-way merge and independent installed retest are underway.
    Evidence
    Team5682
  15. Sidecat UI · Missing qualification or material gap
    Before
    The finite trial used a prepared actor and assistance. Boards completion/prerequisite transition, refresh during a pending selection switch, denied original, reconnected MCP/Lisp and the complete operator goals/conversation/authorized-decision/usage path remain unqualified. External human review is not a release prerequisite.
    After
    The UI regression omitted displayed-proposal binding/refusal, task-change context clearing, Shift input, task breadcrumb and footer. Their unpublished predecessor source must be merged and published with Boards. Broader responsiveness, feedback, conversation, authorized decisions and useful current usage remain unqualified.
    Evidence
    Team5682
  16. Sidecat UI · Sprint disposition
    Before
    Cedar now owns Node and SidecatUI together, including caching, responsiveness and useful operator interaction. Its UI takeover child is mapping the existing implementation and building a first useful slice. Previous finite S007 evidence stands; no new UI completion is claimed.
    After
    Cedar owns Node/UI together and is merging the exact S007 predecessor with published Boards, preserving unrelated owner work. Ship and test the resulting matched source/default; source gates alone do not qualify the operator path.
    Evidence
    Team5682, Team5688
2026-10-10T01:25:32Z · 24 changed cells

New source and fresh-node trials, product-area ownership and actual interruption recovery; no full-outcome promotion or release-scope change

  1. Organizational context · Missing qualification or material gap
    Before
    Fresh orientation still exposes identifiers and misses useful project context. Scoped semantic inheritance and consistent first-contact preparation remain unfinished.
    After
    Prepared orientation works, but scoped inheritance and ordinary package adoption remain unfinished. The organization-context library exists in source; its retained owner suite was failing at the previous handoff. An isolated successor is under repair.
    Evidence
    Team5623, Team5627
  2. Identity, authority and resources · Missing qualification or material gap
    Before
    The installed e4 trial carries the earlier allowance slice but does not activate the opt-in authority service. Later Begin/settlement are source-only; actual guarded effects, facade use and the full delegated-resource journey remain incomplete.
    After
    Authority components pass owner suites, but the common authority facade had five failing behaviors in the later source trial. Installed guarded effects, delegation and opt-in governance still need complete qualification.
    Evidence
    Team5600
  3. Lisp and composition · Missing qualification or material gap
    Before
    Prepared assisted coordination only; general fresh-agent continuation, full docs and the separate S007 original-source MCP/Lisp task remain unqualified.
    After
    Ordinary resource-only package installation does not make its Lisp methods available. Existing trials used explicit private preparation; the selected repair extends existing REPL adoption, with context as its first consumer. General prepared composition remains unfinished.
    Evidence
    Team5599, Team5623
  4. Lisp and composition · Sprint disposition
    Before
    Reuse the installed retained-result library for the remaining S007 trials. Preserve the assisted CLI limits and existing S005/S006 evidence.
    After
    Codex semantic product lead owns package adoption, scoped context and prepared composition, with a Node consumer review from Cedar. Preserve S005/S006 evidence and complete S007 ordinary entry.
    Evidence
    Team5615, Team5623
  5. Marketplace and packages · Existing implementation or use
    Before
    Helper 0.1.1 installs and loads explicitly in the earlier isolated candidate. Successor e4 builds ten artifact stages and installs five ordinary apps;143 installed files match artifacts.
    After
    Earlier helper install/adoption remains exercised. Later isolated rc3 builds passed 13 artifact stages and installed six application bundles; 151 authored documentation files plus an index were checked. Cedar's fresh-node package trial found and repaired an empty-index response in source; its rebuilt candidate awaits installed use.
    Evidence
    Team5593, Team5626
  6. Marketplace and packages · Missing qualification or material gap
    Before
    The local RC is unpublished and unavailable publicly. Marketplace lifecycle, pending-work replacement, independent adoption and other platforms remain incomplete. Candidate user docs are supplemental; installer packaging repair is not yet GREEN.
    After
    The integrated candidate and current repairs are unpublished. Marketplace lifecycle, resource-only library adoption and independent complete package use remain unfinished; new installed proof must follow the source repairs.
    Evidence
    Team5598, Team5599, Team5626
  7. Marketplace and packages · Sprint disposition
    Before
    Codex B owns wider lifecycle; retain isolated install/adoption proof and complete ordinary package use.
    After
    Codex owns semantic package adoption and composition; Cedar owns Node package integration and the fresh-node package trial. Codex B is off.
    Evidence
    Team5615, Team5623, Team5626
  8. Semantic engine · Product capability
    Before
    Semantic definitions and discovery
    After
    Semantic engine
    Evidence
    Operator clarification: semantic discovery is one part of the engine
  9. Semantic engine · Missing qualification or material gap
    Before
    Find needs supplied catalog/documents/meaning. No top-level task-to-command semantic discovery exists. Broader vocabulary/mapping/domain-authoring and ordinary S007 participant use remain unqualified.
    After
    Ordinary installation still lacks usable adoption of the context/discovery libraries, and capability catalog assembly needs repair. Meaning, types and relations, mapping, scoped context, prepared composition, assessment/explanation and discovery remain the full intended engine scope; none is waived by a narrow discovery result.
    Evidence
    Team5599, Team5623, Operator semantic-engine scope
  10. Semantic engine · Sprint disposition
    Before
    Cedar leads the semantic engine as an agent workhorse: one owner declaration and shared ranking contract, ordinary task-find/task-do with identifiers internal by default, and explicit inspection. Marketplace and UI consume that contract. Source development and installed qualification remain separate.
    After
    Codex semantic product lead owns the full engine area. First delivery joins existing context/library code to ordinary installed adoption, followed by prepared domain tasks and independent qualification; Cedar reviews the Node boundary.
    Evidence
    Team5615, Team5623, Team5627
  11. Managed agent work · Existing implementation or use
    Before
    Work successor source passes37 owner tests. Real manager/child activation and disposition source passes86 top-level /125 events; these patches are integrated into e4.
    After
    Earlier manager/child source evidence remains. A later real child-process source trial passed application Plan and RolesAssignment handoff, immutable-context checks and completion recording; process exit is kept distinct from actual Plan completion.
    Evidence
    Team5601
  12. Managed agent work · Missing qualification or material gap
    Before
    The native disposition reader is prepared and uncompiled. Public pin/read, typed Plan dispatch, cross-principal ownership, installed cancellation/retry and attributable cross-harness return remain incomplete.
    After
    The Plan bridge source evidence is not complete installed managed work. Cross-harness returns, current-principal authority, cancellation/retry and restart recovery need integrated user-path qualification.
    Evidence
    Team5601
  13. Managed agent work · Sprint disposition
    Before
    Orchestration engineer owns the public reader and Plan bridge. Qualify the installed managed task independently; process-disposition source proof alone does not complete it.
    After
    Root retains integration responsibility and coordinates the Node owner and remote-execution owner for installed managed work.
    Evidence
    Team5615
  14. Shared bus and federation · Existing implementation or use
    Before
    Typed owner calls and semantic query-host operations are installed on the local bus. Application permission and Content effects remain with their owners.
    After
    Local typed owner calls remain installed. Cedar's fresh-node federation trial executed commands from one node on another. Linden reports completed subscription, local two-node and route-reselection runs; a separate bus check failed.
    Evidence
    Team5606, Team5625
  15. Shared bus and federation · Missing qualification or material gap
    Before
    Independently administered-node cooperation, durable subscriptions and gap/recovery qualification remain incomplete.
    After
    Cross-node Work dispatch failed in the fresh-node trial; successor nodes are prepared but its final demonstration is pending. Local bus runs do not establish independently administered-node recovery or full durable subscription behavior.
    Evidence
    Team5606, Team5625, Team5626
  16. Shared bus and federation · Sprint disposition
    Before
    Linden owns application route reselection and bus/federation recovery, with an independent installed-path reviewer. Current local and finite source evidence does not qualify independently administered-node cooperation.
    After
    Linden owns local bus and application coordination; Aspen owns federation and remote execution. Cedar is transferring its existing federation work after one bounded demonstration. Each owner retains its own full development and QA cycle.
    Evidence
    Team5615, Team5625, Team5626
  17. Feedback and improvement · Sprint disposition
    Before
    Aspen owns responsive UI and retained feedback intake; Root owns the on-demand advice helper. Criticism alone does not dispatch work or reprioritize the selected outcomes.
    After
    Cedar owns the responsive operator interface and retained feedback intake alongside Node. Root aligns priorities and release decisions. The separate QA guide has a first research unit; it is not yet a usable manual or completed QA cycle.
    Evidence
    Team5615, Team5622
  18. Usable interfaces and integrations · Existing implementation or use
    Before
    Earlier prepared CLI/MCP/Lisp sharing and reconnect remain exercised. Public CLI 5211 passes195 author cases and is in e4. A CLI newcomer makes 22 calls and retains an unreviewed practical result; a medium-effort MCP newcomer makes 20 Sidecat calls for a real project/Work task.
    After
    Prepared CLI/MCP/Lisp use remains exercised. rc3 includes installed authored documentation. Cedar's installer repair passed 99 source tests and a fresh Ubuntu installation, rerun, root refusal and restart. Fresh-node REPL/package trials have additional source fixes and are still running.
    Evidence
    Team5593, Team5609, Team5626
  19. Usable interfaces and integrations · Missing qualification or material gap
    Before
    CLI collaboration is blocked; its first process read unrelated bootstrap instructions. MCP run 1 never reached Sidecat because of harness trust; run 2 used medium instead of required xhigh. Corrected trials are pending. User docs are supplemental, with a packaging repair12/13 passing and archive data mode still RED; macOS and wider integrations remain open.
    After
    Installer and later journey repairs are not published; macOS validation and release/documentation version consistency remain open. Actual MCP input-schema and marketplace reference failures were identified. Installed package adoption and coherent ordinary use remain unfinished.
    Evidence
    Team5598, Team5599, Team5609, Team5626
  20. Usable interfaces and integrations · Sprint disposition
    Before
    Codex B owns ordinary CLI/MCP and documentation coherence. Integration preserves each failed attempt and supplies a distinct xhigh MCP caller. No clean required newcomer or public-release claim is made.
    After
    Cedar owns Node/CLI, installer and fresh-node REPL/package trials; Codex owns semantic/common-task integration and release review. Codex B is off.
    Evidence
    Team5615, Team5626
  21. Operational durability and scale · Existing implementation or use
    Before
    Earlier exact Notes/Plan/results survive reconnect. The e4 isolated node ends its first bounded lifetime and resumes with the same store, actors and profiles; an independent lead read recovers the newcomer result.
    After
    Retained records survive earlier node reconnect trials. After a real desktop out-of-memory interruption at19:01 MDT, the heartbeat restored Root's original thread at19:15. Root then manually resumed Claude, Grok and Cursor from retained conversations; completed remote jobs were not replayed.
    Evidence
    Team5619, Team5620, Team5625, Team5626, Team5628
  22. Operational durability and scale · Missing qualification or material gap
    Before
    The2m27s interruption is disclosed. This finite resume is not full backup/recovery, multi-node contention, absent-agent or target-scale qualification.
    After
    Root restart is observed, but the other primary harnesses required manual recovery. Whole-team automatic recovery, backup restoration, contention and target-scale qualification remain unfinished. Resource pressure caused a real interruption.
    Evidence
    Team5628
  23. Operational durability and scale · Sprint disposition
    Before
    S007 new typed cold restoration remains pending. Keep broader durability and scale outcomes incomplete.
    After
    Cedar retains recovery engineering and Node durability; Aspen owns the hourly coordination reminder. Root monitors resources and qualifies recovery behavior. Existing S007 restoration and broader durability obligations remain.
    Evidence
    Team5615, Team5628
  24. Sidecat UI · Sprint disposition
    Before
    Aspen continues the remaining selected UI checks and responsive presentation, with separate intake and ordinary-view workers. The helper probe is not an installed UI result. Preserve the finite assisted original trial; S007 remains unjudged.
    After
    Cedar now owns Node and SidecatUI together, including caching, responsiveness and useful operator interaction. Its UI takeover child is mapping the existing implementation and building a first useful slice. Previous finite S007 evidence stands; no new UI completion is claimed.
    Evidence
    Team5615, Team5626
2026-10-09T10:16:26Z · 27 changed cells

Successor source and isolated installed newcomer activity; failed preparation and incomplete collaboration retained; no full outcome or public availability promotion

  1. Organizational context · Existing implementation or use
    Before
    Guidance, named references, roles and selected working context are used.
    After
    Guidance, named references and roles are used. An isolated newcomer receives a prepared identity and ordinary organization; MCP orientation and project/Work use are observed.
    Evidence
    Team5498, Team5506, Team5510
  2. Organizational context · Missing qualification or material gap
    Before
    Fresh workers still need manual orientation; effective scoped semantic inheritance is not established.
    After
    Fresh orientation still exposes identifiers and misses useful project context. Scoped semantic inheritance and consistent first-contact preparation remain unfinished.
    Evidence
    Team5498, Team5506, Team5510
  3. Identity, authority and resources · Existing implementation or use
    Before
    Prepared actors, access decisions and bounded resource observations exist.
    After
    Prepared actors and owner access controls are used. Exact child-mission source passes 34 Auth cases; allowance 38, Begin/revoke 46 and settlement 67 pass in successive owner suites.
    Evidence
    Team5433, Team5463, Team5472
  4. Identity, authority and resources · Missing qualification or material gap
    Before
    Josh's own usable participation; reachable scoped workers; full remote allowance/delegation outcome remains incomplete.
    After
    The installed e4 trial carries the earlier allowance slice but does not activate the opt-in authority service. Later Begin/settlement are source-only; actual guarded effects, facade use and the full delegated-resource journey remain incomplete.
    Evidence
    Team5433, Team5463, Team5472
  5. Identity, authority and resources · Sprint disposition
    Before
    Cedar owns selected identity/access and execution prerequisites.
    After
    Authority engineer owns the remaining token/executor path. Root integrates qualified successors and judges actual installed authorized effects.
    Evidence
    Team5433, Team5463, Team5472
  6. Work and planning · Existing implementation or use
    Before
    Isolated 66b exercises native helper 0.1.1 install/adoption, Note/Work/Plan creation, progress and explicit Note/Plan sharing. A distinct CLI reader reconnects successfully. Later Work successor source passes 37 owner tests; it is not installed.
    After
    The earlier isolated Note/Work/Plan/progress/share task and distinct-reader reconnect remain exercised. The successor combines Work predecessor recovery and opt-in completion policy: 77 integrated Work events pass. A CLI newcomer retains a practical unreviewed Work result; MCP creates and updates an ordinary project and Work.
    Evidence
    Team5444, Team5467, Team5494, Team5498
  7. Work and planning · Missing qualification or material gap
    Before
    Project/application planning coherence, typed context, opted-in policy and actual worker disposition remain unfinished. Evidence is optional by default.
    After
    Kernel project/Work and application Plan coherence remains incomplete. Newcomer collaboration fails at missing target/session discovery. Full independent completion-policy, successor activation and worker-disposition journeys are still open.
    Evidence
    Team5444, Team5467, Team5494, Team5498
  8. Work and planning · Sprint disposition
    Before
    Root integrates qualified deltas and owns qualification. Preserve exact retired contracts and original attempts; S007 stays unjudged.
    After
    Root owns integration and qualification. Preserve exact retired offers and attempts; keep evidence optional by default. Current participant trials are finite observations, not S007 or full-area completion.
    Evidence
    Team5444, Team5467, Team5494, Team5498
  9. Collective messaging · Missing qualification or material gap
    Before
    Human entry, ordinary reply/thread/attention/return experience incomplete.
    After
    Ordinary collaborator discovery and reply remain incomplete. The CLI newcomer cannot find a colleague through message targets or current-session participants; no colleague feedback is obtained.
    Evidence
    Team5494
  10. Marketplace and packages · Existing implementation or use
    Before
    Exact helper resources install natively in the isolated Linux candidate. Its returned guide/loader supports explicit adoption and a real shared task.
    After
    Helper 0.1.1 installs and loads explicitly in the earlier isolated candidate. Successor e4 builds ten artifact stages and installs five ordinary apps;143 installed files match artifacts.
    Evidence
    Team5484, Team5501
  11. Marketplace and packages · Missing qualification or material gap
    Before
    The local RC is unpublished and unavailable publicly. Broad marketplace lifecycle, pending-work replacement, platforms and independent package adoption remain incomplete.
    After
    The local RC is unpublished and unavailable publicly. Marketplace lifecycle, pending-work replacement, independent adoption and other platforms remain incomplete. Candidate user docs are supplemental; installer packaging repair is not yet GREEN.
    Evidence
    Team5484, Team5501
  12. Executable procedures · Existing implementation or use
    Before
    Integrated unknown-outcome repair passes 6 checks. Separate cancellation/retry owner source passes 76; pending-retry amendment successor passes 78, preserving prior attempts.
    After
    Unknown-outcome, cancellation/retry and pending-retry repairs are integrated. Later stopped-observation source passes 80 selected owner tests; four integrated unknown/known/canceled/interrupted controls pass.
    Evidence
    Team5495, Team5467
  13. Executable procedures · Missing qualification or material gap
    Before
    Later source is absent from installed 66b. Public cancellation/retry routes, uncertainty boundaries, waits and the full procedure journey remain open.
    After
    Native cancellation/retry routes remain missing in the separate owner trial. Its latest run also has a temporary-socket setup failure in one old control, so it is not clean RED. Full waits, recovery and installed procedure use remain open.
    Evidence
    Team5495, Team5467
  14. Executable procedures · Sprint disposition
    Before
    Integrate exact reviewed deltas and complete public routes plus installed cancellation/retry/recovery.
    After
    Orchestration engineer owns native routing and recovery; integration keeps actual uncertainty and stopped outcomes separate from success.
    Evidence
    Team5495, Team5467
  15. Managed agent work · Existing implementation or use
    Before
    Separate Work successor source passes 37 tests, including uniqueness, restart and exact old-key/contract recovery. This is source-only predecessor/successor context.
    After
    Work successor source passes37 owner tests. Real manager/child activation and disposition source passes86 top-level /125 events; these patches are integrated into e4.
    Evidence
    Team5495
  16. Managed agent work · Missing qualification or material gap
    Before
    Actual worker activation/disposition, authority delegation, attributable installed runs and cross-harness return remain incomplete.
    After
    The native disposition reader is prepared and uncompiled. Public pin/read, typed Plan dispatch, cross-principal ownership, installed cancellation/retry and attributable cross-harness return remain incomplete.
    Evidence
    Team5495
  17. Managed agent work · Sprint disposition
    Before
    Keep ready component owners parallel; retain the old unfinished occurrence and verify replacement results against the same Work.
    After
    Orchestration engineer owns the public reader and Plan bridge. Qualify the installed managed task independently; process-disposition source proof alone does not complete it.
    Evidence
    Team5495
  18. Shared bus and federation · Sprint disposition
    Before
    Use the existing query and Content contracts for S007; no federation expansion is selected.
    After
    Linden owns application route reselection and bus/federation recovery, with an independent installed-path reviewer. Current local and finite source evidence does not qualify independently administered-node cooperation.
    Evidence
    Team5496
  19. Feedback and improvement · Existing implementation or use
    Before
    Operator findings and independent reviews are retained in native Team/Work. Two QA audits reproduced help, discovery, coverage-list and installed-manual gaps; Team5091/5093 preserve the findings and corrective audit.
    After
    Native findings and independent participant reports are retained unchanged. Current trials expose collaboration, documentation, orientation and output friction. A separate helper probe returns structured criticism advice with zero tool events.
    Evidence
    Team5497
  20. Feedback and improvement · Missing qualification or material gap
    Before
    No complete current command-to-expectation-to-evidence coverage ledger was demonstrated. QA-review usefulness and comparable task costs are not established by test counts.
    After
    The helper probe is backend feasibility, not installed UI or automatic priority change. Complete feedback intake, comparable task costs, useful independent QA and accepted improvement delivery remain unfinished.
    Evidence
    Team5497
  21. Feedback and improvement · Sprint disposition
    Before
    Corrective QA coverage audit underway. Rowan must assign disposition/implementation; broad all-hands QA and unfamiliar current-build trials are not complete.
    After
    Aspen owns responsive UI and retained feedback intake; Root owns the on-demand advice helper. Criticism alone does not dispatch work or reprioritize the selected outcomes.
    Evidence
    Team5497
  22. Usable interfaces and integrations · Existing implementation or use
    Before
    Prepared isolated Note/Plan/progress/share and CLI/MCP/Lisp reconnect pass; a distinct CLI reader confirms exact records. CF19 help source 4612b432 is public after 173 tests/subcases.
    After
    Earlier prepared CLI/MCP/Lisp sharing and reconnect remain exercised. Public CLI 5211 passes195 author cases and is in e4. A CLI newcomer makes 22 calls and retains an unreviewed practical result; a medium-effort MCP newcomer makes 20 Sidecat calls for a real project/Work task.
    Evidence
    Team5494, Team5498, Team5499, Team5501, Team5506, Team5510
  23. Usable interfaces and integrations · Missing qualification or material gap
    Before
    Local RC is unpublished and assisted. S007 MCP/Lisp, full manuals, macOS, tracker integration and the complete first-worker path remain unqualified.
    After
    CLI collaboration is blocked; its first process read unrelated bootstrap instructions. MCP run 1 never reached Sidecat because of harness trust; run 2 used medium instead of required xhigh. Corrected trials are pending. User docs are supplemental, with a packaging repair12/13 passing and archive data mode still RED; macOS and wider integrations remain open.
    Evidence
    Team5494, Team5498, Team5499, Team5501, Team5506, Team5510
  24. Usable interfaces and integrations · Sprint disposition
    Before
    Complete the remaining ordinary S007 surfaces and controls. Keep help delivery and coherent discovery/recovery improvements on their native corrective backlog; do not infer qualification from help test counts.
    After
    Codex B owns ordinary CLI/MCP and documentation coherence. Integration preserves each failed attempt and supplies a distinct xhigh MCP caller. No clean required newcomer or public-release claim is made.
    Evidence
    Team5494, Team5498, Team5499, Team5501, Team5506, Team5510
  25. Operational durability and scale · Existing implementation or use
    Before
    S006 retained named state and actual source observations reopened unchanged without reseeding. Component runs use bounded remote resources and source/artifact matching.
    After
    Earlier exact Notes/Plan/results survive reconnect. The e4 isolated node ends its first bounded lifetime and resumes with the same store, actors and profiles; an independent lead read recovers the newcomer result.
    Evidence
    Team5484
  26. Operational durability and scale · Missing qualification or material gap
    Before
    Bounded reopening is not full backup/recovery, multi-node contention, absent-agent or target-scale qualification.
    After
    The2m27s interruption is disclosed. This finite resume is not full backup/recovery, multi-node contention, absent-agent or target-scale qualification.
    Evidence
    Team5484
  27. Sidecat UI · Sprint disposition
    Before
    Aspen owns the remaining selected UI checks and operator-focused presentation/docs in a protected source tree. Preserve the actual finite trial and its limits. New source is under development; S007 stays unjudged until its remaining outcomes receive an explicit disposition.
    After
    Aspen continues the remaining selected UI checks and responsive presentation, with separate intake and ordinary-view workers. The helper probe is not an installed UI result. Preserve the finite assisted original trial; S007 remains unjudged.
    Evidence
    Team5497
2026-10-09T07:17:51Z · 15 changed cells

Isolated prepared coordination and later qualified owner source; no full outcome or public availability promotion

  1. Work and planning · Existing implementation or use
    Before
    Reusable Work, Plan occurrences, boards and judgments are used. The maintained assignment helper0.1.1 now shares both task Notes and Plans with explicit readers. Its tests-first repair passed8 pure cases, actual owner grants and independent Linden Plan/Work/Note reads; source2423 is published.
    After
    Isolated 66b exercises native helper 0.1.1 install/adoption, Note/Work/Plan creation, progress and explicit Note/Plan sharing. A distinct CLI reader reconnects successfully. Later Work successor source passes 37 owner tests; it is not installed.
    Evidence
    Team5417, Team5418, Team5419
  2. Work and planning · Missing qualification or material gap
    Before
    Native project planning and application Plans still form different paths. Typed scoped context and opted-in scrum-condition enforcement remain incomplete. Evidence stays optional by default; qualification and release belong to Root, without an outside-human gate.
    After
    Project/application planning coherence, typed context, opted-in policy and actual worker disposition remain unfinished. Evidence is optional by default.
    Evidence
    Team5417, Team5418, Team5419
  3. Work and planning · Sprint disposition
    Before
    Root owns the24-hour release push and its native release board. Preserve original S007 work and judgments; integrate the qualified helper correction while completing the broader planning/context path. Opt-in governance Work remains explicitly unfinished.
    After
    Root integrates qualified deltas and owns qualification. Preserve exact retired contracts and original attempts; S007 stays unjudged.
    Evidence
    Team5417, Team5418, Team5419
  4. Lisp and composition · Existing implementation or use
    Before
    S006 retained values and actual source observations reopen without reseeding. The installed S007 retained_result library has six exports; assisted ordinary CLI use exercised choice, full-original read and restoration. S005 finite guidance remains Qualified. Development assignment/progress composition is catfooded; the0.1.1 reader repair has eight passing pure cases and actual installed-owner/independent-reader proof.
    After
    Installed helper 0.1.1 loads explicitly into a named Lisp environment with zero owner calls. Assignment/progress/sharing and fresh Lisp/MCP reads preserve exact Notes and Plan; prior S005/S006 evidence stands.
    Evidence
    Team5418, Team5419
  5. Lisp and composition · Missing qualification or material gap
    Before
    General fresh-agent continuation and full Lisp documentation remain incomplete. The S007 sample needed shipped package guidance and assistance; independent ordinary reconnected MCP/Lisp acceptance remains open.
    After
    Prepared assisted coordination only; general fresh-agent continuation, full docs and the separate S007 original-source MCP/Lisp task remain unqualified.
    Evidence
    Team5418, Team5419
  6. Marketplace and packages · Existing implementation or use
    Before
    S005 finite guidance-use is Qualified. The S007 caller package is natively installed and locally ready; installed inspection exposes six exports and the exact 13,326-byte GUIDE. One assisted CLI participant used the installed library.
    After
    Exact helper resources install natively in the isolated Linux candidate. Its returned guide/loader supports explicit adoption and a real shared task.
    Evidence
    Team5419
  7. Marketplace and packages · Missing qualification or material gap
    Before
    Broad public/internal package lifecycle and pending-work replacement remain unqualified. Caller source publication is held at a repository setup prerequisite; ordinary failure results do not identify the missing prerequisite, actual setup owner or supported repair/request action. Installed resource readiness does not establish complete marketplace qualification.
    After
    The local RC is unpublished and unavailable publicly. Broad marketplace lifecycle, pending-work replacement, platforms and independent package adoption remain incomplete.
    Evidence
    Team5419
  8. Executable procedures · Existing implementation or use
    Before
    Bounded composed caller/pantry tasks were accepted.
    After
    Integrated unknown-outcome repair passes 6 checks. Separate cancellation/retry owner source passes 76; pending-retry amendment successor passes 78, preserving prior attempts.
    Evidence
    Team5391, Team5411, Team5420
  9. Executable procedures · Missing qualification or material gap
    Before
    The full configured procedure journey, installed discovery, restart/harness replacement, waits, cancellation and retry remain unqualified. A real Engine/reopened-SQLite test now reproduces the adapter incorrectly treating an unknown executor outcome as failed; its known-exit7 control passes.
    After
    Later source is absent from installed 66b. Public cancellation/retry routes, uncertainty boundaries, waits and the full procedure journey remain open.
    Evidence
    Team5391, Team5411, Team5420
  10. Managed agent work · Existing implementation or use
    Before
    External team harnesses and native Sol delegation execute bounded assignments. Team5083 reassigned a stalled caller occurrence; Team5089 reports actual source and checks on the replacement branch.
    After
    Separate Work successor source passes 37 tests, including uniqueness, restart and exact old-key/contract recovery. This is source-only predecessor/successor context.
    Evidence
    Team5417, Team5420
  11. Managed agent work · Missing qualification or material gap
    Before
    An assignment or live process does not prove successful work. Automatic cross-harness activation, durable return, context and attribution remain incomplete.
    After
    Actual worker activation/disposition, authority delegation, attributable installed runs and cross-harness return remain incomplete.
    Evidence
    Team5417, Team5420
  12. Usable interfaces and integrations · Existing implementation or use
    Before
    Installed CLI1.0.0-dev.20261008.s007-help-candidate-tree7dc025bd now refuses project plan judge --help with exit2 and an actionable parent-query explanation. The S007 original read/restore worked with assistance. Qualified assignment helper0.1.1 is published and in use through the installed owners.
    After
    Prepared isolated Note/Plan/progress/share and CLI/MCP/Lisp reconnect pass; a distinct CLI reader confirms exact records. CF19 help source 4612b432 is public after 173 tests/subcases.
    Evidence
    Team5416, Team5418, Team5419
  13. Usable interfaces and integrations · Missing qualification or material gap
    Before
    The installed man page still has no judge index entry. Unassisted task discovery, complete manual/examples, ordinary reconnected MCP, Linux/macOS installation and issue-tracker synchronization remain unqualified. The repository-prerequisite help correction has behavioral RED; its GREEN and the MCP identity qualification remain pending. No new top-level command or automatic permission gate is implied.
    After
    Local RC is unpublished and assisted. S007 MCP/Lisp, full manuals, macOS, tracker integration and the complete first-worker path remain unqualified.
    Evidence
    Team5416, Team5418, Team5419
  14. Marketplace and packages · Sprint disposition
    Before
    Continue ordinary use of the ready installed package and resolve the held source-publication prerequisite through its owner. Keep broader lifecycle work separate from S007.
    After
    Codex B owns wider lifecycle; retain isolated install/adoption proof and complete ordinary package use.
    Evidence
    Team5419
  15. Executable procedures · Sprint disposition
    Before
    The assigned orchestration author is repairing the reproduced unknown-outcome defect tests-first, then completing durable task and managed-run contracts on the existing sidecat-orch owner. Integration preserves original attempts; this repair does not waive the full procedure outcome.
    After
    Integrate exact reviewed deltas and complete public routes plus installed cancellation/retry/recovery.
    Evidence
    Team5391, Team5411, Team5420
2026-10-09T05:54:01Z · 12 changed cells

Root24-hour delivery push: qualified assignment sharing, finite installed UI trial, current CLI help behavior and actual orchestration RED; full outcomes unchanged

  1. Work and planning · Existing implementation or use
    Before
    Reusable Work, assigned Plan occurrences, boards and terminal judgments are used. The corrective QA coverage audit now has a native underway Plan and shared evidence.
    After
    Reusable Work, Plan occurrences, boards and judgments are used. The maintained assignment helper0.1.1 now shares both task Notes and Plans with explicit readers. Its tests-first repair passed8 pure cases, actual owner grants and independent Linden Plan/Work/Note reads; source2423 is published.
    Evidence
    Team5320, Team5362, Team5365
  2. Work and planning · Missing qualification or material gap
    Before
    Native project planning and application Plan judgment are not one clear user path. Capability analysis is not enforced as an opted-in scrum condition; a stable complete report was missing. Evidence stays optional by default.
    After
    Native project planning and application Plans still form different paths. Typed scoped context and opted-in scrum-condition enforcement remain incomplete. Evidence stays optional by default; qualification and release belong to Root, without an outside-human gate.
    Evidence
    Team5320, Team5362, Team5365
  3. Work and planning · Sprint disposition
    Before
    Preserve current S007 selected Work. Corrective capability/QA reporting is underway; opt-in governance implementation admission remains with Rowan.
    After
    Root owns the24-hour release push and its native release board. Preserve original S007 work and judgments; integrate the qualified helper correction while completing the broader planning/context path. Opt-in governance Work remains explicitly unfinished.
    Evidence
    Team5320, Team5362, Team5365
  4. Lisp and composition · Existing implementation or use
    Before
    S006 retained values and actual source observations reopened without reseeding. The installed S007 retained_result library exposes six exports; ordinary CLI library calls exercised deliberate choice, full original reading and carried restoration. S005 finite guidance remains Qualified.
    After
    S006 retained values and actual source observations reopen without reseeding. The installed S007 retained_result library has six exports; assisted ordinary CLI use exercised choice, full-original read and restoration. S005 finite guidance remains Qualified. Development assignment/progress composition is catfooded; the0.1.1 reader repair has eight passing pure cases and actual installed-owner/independent-reader proof.
    Evidence
    Team5320, Team5362, Team5365
  5. Semantic definitions and discovery · Sprint disposition
    Before
    S007 integrates unfamiliar declared meaning, whole-contract assessment and deliberate source choice. Command discovery/manual gaps are explicit refinement inputs.
    After
    Cedar leads the semantic engine as an agent workhorse: one owner declaration and shared ranking contract, ordinary task-find/task-do with identifiers internal by default, and explicit inspection. Marketplace and UI consume that contract. Source development and installed qualification remain separate.
    Evidence
    Team5339, Team5345
  6. Executable procedures · Missing qualification or material gap
    Before
    General durable waits, decisions and continuation across harness replacement not qualified.
    After
    The full configured procedure journey, installed discovery, restart/harness replacement, waits, cancellation and retry remain unqualified. A real Engine/reopened-SQLite test now reproduces the adapter incorrectly treating an unknown executor outcome as failed; its known-exit7 control passes.
    Evidence
    Team5350, Team5366
  7. Executable procedures · Sprint disposition
    Before
    Build only the selected real continuation path.
    After
    The assigned orchestration author is repairing the reproduced unknown-outcome defect tests-first, then completing durable task and managed-run contracts on the existing sidecat-orch owner. Integration preserves original attempts; this repair does not waive the full procedure outcome.
    Evidence
    Team5350, Team5366
  8. Usable interfaces and integrations · Existing implementation or use
    Before
    Installed CLI c2f0ab27 and operation search remain available. A fresh CLI participant read and restored the correct S007 original with assistance in 16 calls. The help repair has assertion RED, focused GREEN and passing affected/manual checks; delivery remains pending.
    After
    Installed CLI1.0.0-dev.20261008.s007-help-candidate-tree7dc025bd now refuses project plan judge --help with exit2 and an actionable parent-query explanation. The S007 original read/restore worked with assistance. Qualified assignment helper0.1.1 is published and in use through the installed owners.
    Evidence
    Team5320, Team5362, Team5365
  9. Usable interfaces and integrations · Missing qualification or material gap
    Before
    Ordinary library-route discovery required assistance. The installed man page remains stale; judge is absent from its index; invalid project plan judge help succeeds with parent help. search/apropos remain absent. Readable task association, updated installed help/manual, unassisted use, reconnected MCP and tracker synchronization remain unqualified. Ordinary task/library preparation and owner-failure results need discoverable missing prerequisites, actual owners and supported next actions; no new top-level command or automatic permission gate is selected (Team5159/5162).
    After
    The installed man page still has no judge index entry. Unassisted task discovery, complete manual/examples, ordinary reconnected MCP, Linux/macOS installation and issue-tracker synchronization remain unqualified. The repository-prerequisite help correction has behavioral RED; its GREEN and the MCP identity qualification remain pending. No new top-level command or automatic permission gate is implied.
    Evidence
    Team5320, Team5362, Team5365
  10. Sidecat UI · Existing implementation or use
    Before
    S006 exercised the full 876-character original viewport and return. The corrected S007 UI passes 22 Rust and 16 Go cases. A normal production UI/gateway pair is installed; its dashboard shows eight assigned and eight created rows under the delivery actor.
    After
    Installed UI73fd6b52/gateway47cc6535 exercised the selected S007 task: capital context input and first query character were retained; three viewport captures matched the complete1518-character original after viewport normalization; same-task Back/reopen retained it. Switching tasks cleared the old source and the earlier lot stayed honestly missing/invalidated.
    Evidence
    Team5333, Team5341
  11. Sidecat UI · Missing qualification or material gap
    Before
    The installed pantry UI trial is blocked: query/context editors drop the first capital letter, so the displayed context label cannot be entered faithfully and no original is read. Back/Restore returns an ambiguous result. Human own-identity participation and broad UI acceptance remain incomplete.
    After
    The finite trial used a prepared actor and assistance. Boards completion/prerequisite transition, refresh during a pending selection switch, denied original, reconnected MCP/Lisp and the complete operator goals/conversation/authorized-decision/usage path remain unqualified. External human review is not a release prerequisite.
    Evidence
    Team5333, Team5341
  12. Sidecat UI · Sprint disposition
    Before
    Repair the observed UI text-entry routing defect and rerun the selected two-lot task, full original, Back and cold reopen. Keep component GREEN and installed delivery separate from participant acceptance; S007 remains unjudged.
    After
    Aspen owns the remaining selected UI checks and operator-focused presentation/docs in a protected source tree. Preserve the actual finite trial and its limits. New source is under development; S007 stays unjudged until its remaining outcomes receive an explicit disposition.
    Evidence
    Team5333, Team5341
2026-10-08T20:58:42Z · 15 changed cells

Bounded evidence through Team5166; assisted CLI use, installed component delivery and actual UI input failure; no full qualification

  1. Records and source references · Existing implementation or use
    Before
    S006 exercised an exact originating Note read through semantic assessment: all 876 characters matched the independent owner read. Named results retain the actual observation and reopen without reseeding.
    After
    S006 exercised an exact 876-character originating Note. S007 now captures distinct originals; an assisted installed CLI participant deliberately selected, read and restored the correct 1,518-character original. Independent readback confirmed the bound task, source, title and full text.
    Evidence
    Team5156, Team5158, Team5163
  2. Records and source references · Missing qualification or material gap
    Before
    Full-area qualification remains incomplete. S007's distinct-source capture, explicit choice and task-bound reader/restore are still under implementation and testing.
    After
    Full-area qualification remains incomplete. The S007 CLI sample used an existing prepared actor and assistance; both-lot controls, ordinary reconnected MCP/Lisp and production UI participant acceptance remain open.
    Evidence
    Team5156, Team5158, Team5163
  3. Records and source references · Sprint disposition
    Before
    S006 finite original-source increment completed at Exercised scope. S007 advances exact source association and ordinary entry; no full V1-03 completion.
    After
    Retain the exercised original-read and restore evidence. Complete the selected S007 ordinary-use controls and remaining surfaces before judgment; no full V1-03 completion.
    Evidence
    Team5156, Team5158, Team5163
  4. Lisp and composition · Existing implementation or use
    Before
    S006 exercised retained named values/functions and actual source observation across reopened environments. S005 guidance-use is Qualified within its finite existing-actor boundary.
    After
    S006 retained values and actual source observations reopened without reseeding. The installed S007 retained_result library exposes six exports; ordinary CLI library calls exercised deliberate choice, full original reading and carried restoration. S005 finite guidance remains Qualified.
    Evidence
    Team5158, Team5163
  5. Lisp and composition · Missing qualification or material gap
    Before
    General fresh-agent continuation and full Lisp documentation remain incomplete. New S007 capture/caller source has synthetic boundary checks, not installed participant qualification.
    After
    General fresh-agent continuation and full Lisp documentation remain incomplete. The S007 sample needed shipped package guidance and assistance; independent ordinary reconnected MCP/Lisp acceptance remains open.
    Evidence
    Team5158, Team5163
  6. Lisp and composition · Sprint disposition
    Before
    Reuse the maintained retained-result package. S007 caller work continues on the reassigned isolated Sol author occurrence.
    After
    Reuse the installed retained-result library for the remaining S007 trials. Preserve the assisted CLI limits and existing S005/S006 evidence.
    Evidence
    Team5158, Team5163
  7. Marketplace and packages · Existing implementation or use
    Before
    Maintained helper source a9110345 is published. The installed durable_conversation GUIDE supplies eight capability cards; S005 finite guidance-use is Qualified under its stated sample limits.
    After
    S005 finite guidance-use is Qualified. The S007 caller package is natively installed and locally ready; installed inspection exposes six exports and the exact 13,326-byte GUIDE. One assisted CLI participant used the installed library.
    Evidence
    Team5156, Team5158, Team5162, Team5163, Team5159
  8. Marketplace and packages · Missing qualification or material gap
    Before
    Eight card topics are not eight qualified product capabilities. Maintained caller-package installation, broad public/internal lifecycle and pending-work replacement remain unqualified. Source publication currently fails without identifying the missing repository prerequisite, actual setup owner or supported repair/request action (Team5159/5162).
    After
    Broad public/internal package lifecycle and pending-work replacement remain unqualified. Caller source publication is held at a repository setup prerequisite; ordinary failure results do not identify the missing prerequisite, actual setup owner or supported repair/request action. Installed resource readiness does not establish complete marketplace qualification.
    Evidence
    Team5156, Team5158, Team5162, Team5163, Team5159
  9. Marketplace and packages · Sprint disposition
    Before
    Use installed guidance and existing delivery mechanisms. New S007 caller/package delivery remains pending; no broad marketplace campaign.
    After
    Continue ordinary use of the ready installed package and resolve the held source-publication prerequisite through its owner. Keep broader lifecycle work separate from S007.
    Evidence
    Team5156, Team5158, Team5162, Team5163, Team5159
  10. Usable interfaces and integrations · Existing implementation or use
    Before
    CLI c2f0ab27 is now installed. Live operation search finds appwork.plan.judge; independent audits exercised help availability for 129 leaves. S006 exercised meaningful CLI/temporary MCP/Lisp output.
    After
    Installed CLI c2f0ab27 and operation search remain available. A fresh CLI participant read and restored the correct S007 original with assistance in 16 calls. The help repair has assertion RED, focused GREEN and passing affected/manual checks; delivery remains pending.
    Evidence
    Team5158, Team5161, Team5162, Team5163, Team5159
  11. Usable interfaces and integrations · Missing qualification or material gap
    Before
    Installed man page is stale; judge is absent from its index; invalid project plan judge --help succeeds with parent help. search/apropos are absent. Complete searchable manual, unfamiliar task acceptance and tracker synchronization remain unqualified. Ordinary task/library preparation and owner-failure results need discoverable missing prerequisites, actual owners and supported next actions; no new top-level command or automatic permission gate is selected (Team5159/5162).
    After
    Ordinary library-route discovery required assistance. The installed man page remains stale; judge is absent from its index; invalid project plan judge help succeeds with parent help. search/apropos remain absent. Readable task association, updated installed help/manual, unassisted use, reconnected MCP and tracker synchronization remain unqualified. Ordinary task/library preparation and owner-failure results need discoverable missing prerequisites, actual owners and supported next actions; no new top-level command or automatic permission gate is selected (Team5159/5162).
    Evidence
    Team5158, Team5161, Team5162, Team5163, Team5159
  12. Usable interfaces and integrations · Sprint disposition
    Before
    Preserve installed presentation improvement. Treat manual parity, help correctness and task discovery as explicit unresolved QA requirements; default MCP reconnect and S007 trials remain separate.
    After
    Complete the remaining ordinary S007 surfaces and controls. Keep help delivery and coherent discovery/recovery improvements on their native corrective backlog; do not infer qualification from help test counts.
    Evidence
    Team5158, Team5161, Team5162, Team5163, Team5159
  13. Sidecat UI · Existing implementation or use
    Before
    S006 exercised the matched operator viewport against the complete 876-character original and return. S007 task UI component tests pass; the accepted cache UI is separately built/staged.
    After
    S006 exercised the full 876-character original viewport and return. The corrected S007 UI passes 22 Rust and 16 Go cases. A normal production UI/gateway pair is installed; its dashboard shows eight assigned and eight created rows under the delivery actor.
    Evidence
    Team5156, Team5161, Team5166
  14. Sidecat UI · Missing qualification or material gap
    Before
    Human own-identity participation and broad UI acceptance remain incomplete. New typed task restore/body trials remain pending; independent QA found the Esc-cancel editor defect and focused tests fail as expected.
    After
    The installed pantry UI trial is blocked: query/context editors drop the first capital letter, so the displayed context label cannot be entered faithfully and no original is read. Back/Restore returns an ambiguous result. Human own-identity participation and broad UI acceptance remain incomplete.
    Evidence
    Team5156, Team5161, Team5166
  15. Sidecat UI · Sprint disposition
    Before
    Deliver and qualify the corrected task-bound UI with the maintained caller. Cache source/staging and legacy tests do not qualify the new task route.
    After
    Repair the observed UI text-entry routing defect and rerun the selected two-lot task, full original, Back and cold reopen. Keep component GREEN and installed delivery separate from participant acceptance; S007 remains unjudged.
    Evidence
    Team5156, Team5161, Team5166
2026-10-08T20:36:34Z · 3 changed cells

Josh5159 actionable owner/prerequisite failure gap; backlog only, no maturity promotion or changed S007 acceptance

  1. Marketplace and packages · Missing qualification or material gap
    Before
    Eight card topics are not eight qualified product capabilities. Maintained caller-package installation, broad public/internal lifecycle and pending-work replacement remain unqualified.
    After
    Eight card topics are not eight qualified product capabilities. Maintained caller-package installation, broad public/internal lifecycle and pending-work replacement remain unqualified. Source publication currently fails without identifying the missing repository prerequisite, actual setup owner or supported repair/request action (Team5159/5162).
    Evidence
    Team5159, Team5162, work_10e44373ab304615ca9a826265db7d12, plan_126f980f8297707a51c6e63a7b0b9204
  2. Controlled execution · Missing qualification or material gap
    Before
    That build path does not qualify general controlled local/remote execution, cancellation, connector effects or actionable unknown outcomes.
    After
    That build path does not qualify general controlled local/remote execution, cancellation, connector effects or actionable unknown outcomes. The protected-material failure required private reconstruction of owner setup; general actionable prerequisite discovery and supported repair/request remain unqualified (Team5159/5162).
    Evidence
    Team5159, Team5162, work_10e44373ab304615ca9a826265db7d12, plan_126f980f8297707a51c6e63a7b0b9204
  3. Usable interfaces and integrations · Missing qualification or material gap
    Before
    Installed man page is stale; judge is absent from its index; invalid project plan judge --help succeeds with parent help. search/apropos are absent. Complete searchable manual, unfamiliar task acceptance and tracker synchronization remain unqualified.
    After
    Installed man page is stale; judge is absent from its index; invalid project plan judge --help succeeds with parent help. search/apropos are absent. Complete searchable manual, unfamiliar task acceptance and tracker synchronization remain unqualified. Ordinary task/library preparation and owner-failure results need discoverable missing prerequisites, actual owners and supported next actions; no new top-level command or automatic permission gate is selected (Team5159/5162).
    Evidence
    Team5159, Team5162, work_10e44373ab304615ca9a826265db7d12, plan_126f980f8297707a51c6e63a7b0b9204
2026-10-08T16:20:05Z · 36 changed cells

Current bounded evidence through5095; every changed cell retained

  1. Records and source references · Existing implementation or use
    Before
    Exact Notes are reused by messages and Work; authorized team reads are exercised.
    After
    S006 exercised an exact originating Note read through semantic assessment: all 876 characters matched the independent owner read. Named results retain the actual observation and reopen without reseeding.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  2. Records and source references · Missing qualification or material gap
    Before
    Reader-grant plumbing is exposed and has caused denied contribution reads; full area qualification incomplete.
    After
    Full-area qualification remains incomplete. S007's distinct-source capture, explicit choice and task-bound reader/restore are still under implementation and testing.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  3. Records and source references · Sprint disposition
    Before
    Make the two selected journeys share content correctly.
    After
    S006 finite original-source increment completed at Exercised scope. S007 advances exact source association and ordinary entry; no full V1-03 completion.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  4. Work and planning · Existing implementation or use
    Before
    Work definitions, assigned Plan occurrences, board selection and terminal judgments are in ordinary lead use.
    After
    Reusable Work, assigned Plan occurrences, boards and terminal judgments are used. The corrective QA coverage audit now has a native underway Plan and shared evidence.
    Evidence
    Team5091, Team5093, installed c2f0ab27 CLI/manual probes
  5. Work and planning · Missing qualification or material gap
    Before
    Current task discovery remains cumbersome; native project and application planning views are not yet one usable path.
    After
    Native project planning and application Plan judgment are not one clear user path. Capability analysis is not enforced as an opted-in scrum condition; a stable complete report was missing. Evidence stays optional by default.
    Evidence
    Team5091, Team5093, installed c2f0ab27 CLI/manual probes
  6. Work and planning · Sprint disposition
    Before
    Real continuation is selected; no competing planning ledger.
    After
    Preserve current S007 selected Work. Corrective capability/QA reporting is underway; opt-in governance implementation admission remains with Rowan.
    Evidence
    Team5091, Team5093, installed c2f0ab27 CLI/manual probes
  7. Lisp and composition · Existing implementation or use
    Before
    Bounded caller package acquisition, keep/reopen and return were accepted in S003.
    After
    S006 exercised retained named values/functions and actual source observation across reopened environments. S005 guidance-use is Qualified within its finite existing-actor boundary.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  8. Lisp and composition · Missing qualification or material gap
    Before
    Broader fresh-agent task continuation and interface usability incomplete.
    After
    General fresh-agent continuation and full Lisp documentation remain incomplete. New S007 capture/caller source has synthetic boundary checks, not installed participant qualification.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  9. Lisp and composition · Sprint disposition
    Before
    Reuse the accepted slice in the continuation outcome.
    After
    Reuse the maintained retained-result package. S007 caller work continues on the reassigned isolated Sol author occurrence.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  10. Marketplace and packages · Existing implementation or use
    Before
    Exact caller package delivery provides bounded exercised evidence.
    After
    Maintained helper source a9110345 is published. The installed durable_conversation GUIDE supplies eight capability cards; S005 finite guidance-use is Qualified under its stated sample limits.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  11. Marketplace and packages · Missing qualification or material gap
    Before
    Complete ordinary public/internal lifecycle and pending-work replacement not qualified.
    After
    Eight card topics are not eight qualified product capabilities. Maintained caller-package installation, broad public/internal lifecycle and pending-work replacement remain unqualified.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  12. Marketplace and packages · Sprint disposition
    Before
    Reuse existing packaging; no broad marketplace campaign.
    After
    Use installed guidance and existing delivery mechanisms. New S007 caller/package delivery remains pending; no broad marketplace campaign.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  13. Semantic definitions and discovery · Existing implementation or use
    Before
    Exact identity and typed contracts exist.
    After
    The standalone engine and read-only semantic assessment host are implemented. Host 0.2.0 is installed; actual Find ambiguity/single-source and selected-source Check controls were observed. S006 exercised one real original-source selection/read.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  14. Semantic definitions and discovery · Missing qualification or material gap
    Before
    A usable namespaced vocabulary, mappings and domain-record authoring journey is not established. Operation search alone is not a complete source inventory.
    After
    Find needs supplied catalog/documents/meaning. No top-level task-to-command semantic discovery exists. Broader vocabulary/mapping/domain-authoring and ordinary S007 participant use remain unqualified.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  15. Semantic definitions and discovery · Sprint disposition
    Before
    Use established shared meanings; keep this release gap explicit.
    After
    S007 integrates unfamiliar declared meaning, whole-contract assessment and deliberate source choice. Command discovery/manual gaps are explicit refinement inputs.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  16. Managed agent work · Existing implementation or use
    Before
    Four actual external team sessions have responded; Codex native delegation is available.
    After
    External team harnesses and native Sol delegation execute bounded assignments. Team5083 reassigned a stalled caller occurrence; Team5089 reports actual source and checks on the replacement branch.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  17. Managed agent work · Missing qualification or material gap
    Before
    Role/assignment is not proof of execution readiness. Automatic cross-harness return/context/attribution still incomplete.
    After
    An assignment or live process does not prove successful work. Automatic cross-harness activation, durable return, context and attribution remain incomplete.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  18. Managed agent work · Sprint disposition
    Before
    Reuse native agent/session mechanisms with retained Sidecat task context.
    After
    Keep ready component owners parallel; retain the old unfinished occurrence and verify replacement results against the same Work.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  19. Controlled execution · Existing implementation or use
    Before
    Existing execution contracts and capped remote build path.
    After
    A serialized capped remote builder performs source-matched Go/Rust/site checks and builds, with retained commands, exits and unchanged-source checks.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  20. Controlled execution · Missing qualification or material gap
    Before
    Rowan's named native execution route returned unavailable; broad controlled local/remote outcome incomplete.
    After
    That build path does not qualify general controlled local/remote execution, cancellation, connector effects or actionable unknown outcomes.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  21. Controlled execution · Sprint disposition
    Before
    Resolve the concrete selected execution dependency.
    After
    Reuse the accepted builder. Keep unknown effects untouched; do not infer a general execution qualification from component build passes.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  22. Shared bus and federation · Existing implementation or use
    Before
    Typed local owner calls operate through the bus.
    After
    Typed owner calls and semantic query-host operations are installed on the local bus. Application permission and Content effects remain with their owners.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  23. Shared bus and federation · Missing qualification or material gap
    Before
    Full independently administered-node journey and durable gap/recovery behavior remain incomplete.
    After
    Independently administered-node cooperation, durable subscriptions and gap/recovery qualification remain incomplete.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  24. Shared bus and federation · Sprint disposition
    Before
    Existing calls only; no federation expansion.
    After
    Use the existing query and Content contracts for S007; no federation expansion is selected.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  25. Feedback and improvement · Existing implementation or use
    Before
    Josh's findings, independent proposals and dispositions are retained.
    After
    Operator findings and independent reviews are retained in native Team/Work. Two QA audits reproduced help, discovery, coverage-list and installed-manual gaps; Team5091/5093 preserve the findings and corrective audit.
    Evidence
    Team5091, Team5093, installed c2f0ab27 CLI/manual probes
  26. Feedback and improvement · Missing qualification or material gap
    Before
    Closed improvement loops and comparable task cost evidence are incomplete.
    After
    No complete current command-to-expectation-to-evidence coverage ledger was demonstrated. QA-review usefulness and comparable task costs are not established by test counts.
    Evidence
    Team5091, Team5093, installed c2f0ab27 CLI/manual probes
  27. Feedback and improvement · Sprint disposition
    Before
    Two-sprint QA-review trial with useful-findings and cost measures.
    After
    Corrective QA coverage audit underway. Rowan must assign disposition/implementation; broad all-hands QA and unfamiliar current-build trials are not complete.
    Evidence
    Team5091, Team5093, installed c2f0ab27 CLI/manual probes
  28. Usable interfaces and integrations · Existing implementation or use
    Before
    CLI/MCP/Lisp and a bounded installed client exist.
    After
    CLI c2f0ab27 is now installed. Live operation search finds appwork.plan.judge; independent audits exercised help availability for 129 leaves. S006 exercised meaningful CLI/temporary MCP/Lisp output.
    Evidence
    Team5091, Team5093, installed c2f0ab27 CLI/manual probes
  29. Usable interfaces and integrations · Missing qualification or material gap
    Before
    Actual help failed readability; unfamiliar task completion and required tracker synchronization not qualified.
    After
    Installed man page is stale; judge is absent from its index; invalid project plan judge --help succeeds with parent help. search/apropos are absent. Complete searchable manual, unfamiliar task acceptance and tracker synchronization remain unqualified.
    Evidence
    Team5091, Team5093, installed c2f0ab27 CLI/manual probes
  30. Usable interfaces and integrations · Sprint disposition
    Before
    Fix entry points/help needed for the two outcomes; wider gaps stay visible.
    After
    Preserve installed presentation improvement. Treat manual parity, help correctness and task discovery as explicit unresolved QA requirements; default MCP reconnect and S007 trials remain separate.
    Evidence
    Team5091, Team5093, installed c2f0ab27 CLI/manual probes
  31. Operational durability and scale · Existing implementation or use
    Before
    Some bounded restart/return evidence exists.
    After
    S006 retained named state and actual source observations reopened unchanged without reseeding. Component runs use bounded remote resources and source/artifact matching.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  32. Operational durability and scale · Missing qualification or material gap
    Before
    Full backup/recovery, multi-node concurrency and target-scale evidence not established here.
    After
    Bounded reopening is not full backup/recovery, multi-node contention, absent-agent or target-scale qualification.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  33. Operational durability and scale · Sprint disposition
    Before
    Relevant recovery only; no scale campaign.
    After
    S007 new typed cold restoration remains pending. Keep broader durability and scale outcomes incomplete.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  34. Sidecat UI · Existing implementation or use
    Before
    Installed task/progress/Note views and bounded observations exist.
    After
    S006 exercised the matched operator viewport against the complete 876-character original and return. S007 task UI component tests pass; the accepted cache UI is separately built/staged.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  35. Sidecat UI · Missing qualification or material gap
    Before
    Own-identity room participation and integrated human decisions/return remain incomplete.
    After
    Human own-identity participation and broad UI acceptance remain incomplete. New typed task restore/body trials remain pending; independent QA found the Esc-cancel editor defect and focused tests fail as expected.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092
  36. Sidecat UI · Sprint disposition
    Before
    Rowan delivers a runnable independently tested client for the selected journey.
    After
    Deliver and qualify the corrected task-bound UI with the maintained caller. Cache source/staging and legacy tests do not qualify the new task route.
    Evidence
    s005-capability-maturity, s006-capability-maturity, Team5083, Team5089, Team5092

Original S004 qualification targets

  1. Human-and-agent team participation. Josh enters the real team channel under his own identity, reads task context, replies and returns. Independent supported use must pass, followed by real sprint coordination.
  2. Retained task context and continuation. A fresh worker discovers legitimate unfinished work, advances a real clarification, correction or review, and retains the next result for Josh and a reviewer. Qualification is followed by ordinary team use.

Neither complete outcome was Qualified at the closing review. Unfinished owner work is retained. The unchanged historical brief follows; it is not the current implementation queue.

Selected 7 October 2026 · two bounded outcomes · qualification open

Current progress · Work and acceptance · Report history

This page projects the shared sprint brief and capability maturity baseline retained in Sidecat. The baseline describes the start of S004; current owner progress is on the progress pages, through 7 October 2026 at 15:06 MDT (21:06:53 UTC). Native Sidecat records remain authoritative. Accepted product revision 4 and development revision 3 remain unchanged.

S004 — usable team participation and task continuation

Josh lifted the start block at 12:14 MDT 7 October 2026 and directed each sprint to deliver usable capabilities, with at least two reaching actual normal use. Root selects these two deliverables, using the independent participant inputs. S003 remains closed. The sprint does not reduce the sixteen 1.0.0 commitments.

Deliverable 1: human-and-agent team participation

Josh can enter the real team channel under his own prepared identity, read a bounded current conversation, follow useful task/result context, send direction or a reply, and return later to relevant responses. Agents use the same retained conversation and content. Ordinary participation requires no raw record IDs, borrowed agent profile, hand-assembled Note/grant/post chain, or Root relaying every message.

Reuse the installed Messaging/Content owners, existing actor enrollment/authority, and sidecatui. The client can be terminal-based; a new general chat service or hosted website is unnecessary. The exact entry point and accessibility must be documented and tried by Josh or an independent unfamiliar person/agent with assistance disclosed.

Acceptance: real independent human and agent participants communicate through the installed supported path; attribution and authorized readers are correct; a reply/result remains readable after leaving and reopening; ordinary errors explain the available next step. This must be used for actual sprint coordination after qualification.

Deliverable 2: retained task context and continuation

An agent can find its legitimate current work by meaningful task/role context, receive a concise current brief with pending decisions and actions, advance a real task, and retain a reviewable result. A fresh session or replacement harness recovers that same unfinished task and continues a real clarification/correction/review step without a private predecessor briefing, raw-ID transcription, or repeating a settled effect.

Reuse accepted caller-library acquisition/keep/return, Work/Plan, Content, Messaging, existing execution adapters and retained outcomes. The runtime or reusable prepared task carries exact references; explicit technical inspection remains available. Do not build a second workflow database, universal agent engine or provider cache.

Acceptance: an independent fresh worker continues genuine unfinished work, produces the next result, and a reviewer plus Josh can inspect the connection to the original direction. Merely reading back task status is insufficient. Record context/call/manual-intervention observations; use the supported path in ordinary team work after qualification.

Maturity and meaning

Use the established subsystem vocabulary: Unimplemented, Foundation, Exercised, Qualified. Keep implementation, installed availability, qualification and actual use as distinct evidence dimensions. The target is Qualified for each declared deliverable boundary plus observed normal use; this is not a claim that all Messaging, all Work, federation or 1.0 are qualified. Recover vocabulary from architecture/system.md, architecture/specifications/product-area-maturity-backlog-and-sprint-planning.md and progressive-interface-documentation-and-maturity.md; historical grades are not current node evidence.

Semantic definitions/discovery remain an explicit gap. Our mature use of exact record identity is not proof of a usable namespaced semantic vocabulary/mapping engine. The sprint must reuse actual common meanings for role, actor, worker, Work, Plan, message, capability and maturity. Wider semantic authoring/distribution remains visible release work; no new universal semantics subsystem is silently selected.

Owners and the first bounded work

  • Juniper: delivery, the corrected maturity view, shared context/task contract and integration. Keep the two complete outcomes central.
  • Rowan: human channel/client and Work/context consumers; identify the installed source and smallest complete UI/runtime path.
  • Cedar: Josh's prepared identity/access and content-sharing contract, existing provider/execution authority, serialized build/release path and existing publisher preparation.
  • Linden: fresh-worker/harness continuation, ordinary call usability and execution-adapter reuse. Use the native-harness capability study as input, without inventing a new agent engine.
  • Aspen: independent QA, plan review and installed unfamiliar-use evidence for both outcomes. Coordinate the two-sprint review-of-QA trial.

First, each affected owner returns the exact owned source/candidate, feasible reuse, shared-contract changes and concrete missing dependencies. This is a bounded design/readiness task, not a new general research campaign. Component source edits follow proportionate design and affected-consumer review. Independent QA design can proceed alongside it. No new infrastructure, paid advisory/image API call, or extra worker swarm is selected. Existing ready harnesses and the serialized capped remote builder are the resource envelope; no local Go/Rust/Node compilation.

QA plan review and sampled review of actual QA are a two-sprint trial. The first review sample must not cap the total functional QA coverage of the two deliverables. CLI-help formatting examples inform relevant criteria; other product areas need their own behavior criteria. Record defects and wrong judgments corrected, escapes, and added time/cost. At each closeout reassess; after two sprints continue, change or stop the extra review.

Included support and exclusions

Included support: the ordinary entry points and discovery/help/examples needed for the two outcomes; actual worker identity/readiness; permissions/read sharing; relevant persistence/recovery; maintainable artifacts and publication/install path for the selected components.

Not selected: a whole-product help rewrite, new provider-feed integrations, MiniMax/Jev activation, generalized federation expansion, a marketplace campaign, full scale qualification or new paid infrastructure. Existing needs remain pending rather than erased.

Review and finish

Show the first integrated usable path as soon as it exists. Hold a delivery checkpoint no later than 18:30 MDT today, earlier on a useful demonstration or material blocker. This is a progress/selection checkpoint, not a promised completion time or a reason to wait. Close the sprint naturally when both deliverables meet their finite acceptance and actual use is observed; if not, record the precise shortfall and deliberate disposition. Supporting fixes and process activity alone do not complete it.


Authority: Josh's 12:14 MDT unblock and usable-deliverables instruction; all participant first-round inputs, S003 retained results, and existing product4/development3. Root owns selection and will record finite Plans for the owners. The exact operator briefing is retained and projected to his fixed local page.

Shared supporting material

The current maturity snapshot is retained as s004-capability-maturity; the native-harness comparison is harness-agent-capabilities. Both are shared inputs for every participant, including Josh. Native owner assignments were posted after the common selection. All four agent participants acknowledged the preparation brief and returned independent input; their new implementation/readiness assignments are distinct from those preparation tasks.

Capability maturity at the start of S004

Two bounded deliverables are selected: usable human-and-agent team participation, and retained task context with real continuation. Neither is currently qualified. Both must reach their declared qualified boundary and be used in ordinary team work before S004 can close successfully.

This snapshot uses the verified S003 closeout and 7 October runtime observations. It does not re-run every product area. All sixteen full-version outcomes remain incomplete; a working component or a bounded qualification does not qualify the entire area.

The established meanings

Subsystem evidence uses Unimplemented, Foundation, Exercised and Qualified. Unimplemented means no maintained behavior establishes the responsibility; Foundation means contracts or internal behavior exist without the ordinary journey; Exercised means a bounded ordinary journey with relevant recovery has been demonstrated; Qualified means the documented boundary and release evidence are complete.

Product maturity remains multidimensional: usefulness, architecture, implementation, installed availability, authority/recovery, qualification and caller experience. These are not a single score or a linear product ranking. Interface states such as experimental and stable describe another separate dimension. Actual normal use is evidence, not a replacement label called "using."

The two selected outcomes

Capability boundary Implementation and availability now Qualification and actual use now S004 required result
Human-and-agent team participation Messaging/Content and a task-linked UI exist; whole-room human participation under Josh's own identity is incomplete. Agents actually use retained room posts, with excessive preparation. Josh's independent ordinary entry/read/reply/return journey is unqualified. Qualified supported entry under Josh's own identity; bounded conversation, task context, replies and return; real use in sprint coordination.
Retained task context and continuation Caller acquisition/keep/return and Work/Plan/Content exist; integrated meaningful current-task discovery and replacement continuation remain incomplete. Bounded caller-library return is exercised. Fresh-session completion of genuine unfinished work without a private briefing is unqualified. Qualified discovery and continuation of a real clarification/correction/review, with retained next result, visible human direction and no routine ID handling; normal team use.

Product-area snapshot

Product capability Existing implementation or use Missing qualification or material gap Sprint disposition
Organizational context Guidance, named references, roles and selected working context are used. Fresh workers still need manual orientation; effective scoped semantic inheritance is not established. Improve the context needed for task continuation.
Identity, authority and resources Prepared actors, access decisions and bounded resource observations exist. Josh's own usable participation; reachable scoped workers; full remote allowance/delegation outcome remains incomplete. Cedar owns selected identity/access and execution prerequisites.
Records and source references Exact Notes are reused by messages and Work; authorized team reads are exercised. Reader-grant plumbing is exposed and has caused denied contribution reads; full area qualification incomplete. Make the two selected journeys share content correctly.
Work and planning Work definitions, assigned Plan occurrences, board selection and terminal judgments are in ordinary lead use. Current task discovery remains cumbersome; native project and application planning views are not yet one usable path. Real continuation is selected; no competing planning ledger.
Collective messaging Real room messages, shared content and bounded reads are used. Human entry, ordinary reply/thread/attention/return experience incomplete. Human-and-agent team participation selected.
Lisp and composition Bounded caller package acquisition, keep/reopen and return were accepted in S003. Broader fresh-agent task continuation and interface usability incomplete. Reuse the accepted slice in the continuation outcome.
Marketplace and packages Exact caller package delivery provides bounded exercised evidence. Complete ordinary public/internal lifecycle and pending-work replacement not qualified. Reuse existing packaging; no broad marketplace campaign.
Semantic definitions and discovery Exact identity and typed contracts exist. A usable namespaced vocabulary, mappings and domain-record authoring journey is not established. Operation search alone is not a complete source inventory. Use established shared meanings; keep this release gap explicit.
Executable procedures Bounded composed caller/pantry tasks were accepted. General durable waits, decisions and continuation across harness replacement not qualified. Build only the selected real continuation path.
Managed agent work Four actual external team sessions have responded; Codex native delegation is available. Role/assignment is not proof of execution readiness. Automatic cross-harness return/context/attribution still incomplete. Reuse native agent/session mechanisms with retained Sidecat task context.
Controlled execution Existing execution contracts and capped remote build path. Rowan's named native execution route returned unavailable; broad controlled local/remote outcome incomplete. Resolve the concrete selected execution dependency.
Shared bus and federation Typed local owner calls operate through the bus. Full independently administered-node journey and durable gap/recovery behavior remain incomplete. Existing calls only; no federation expansion.
Feedback and improvement Josh's findings, independent proposals and dispositions are retained. Closed improvement loops and comparable task cost evidence are incomplete. Two-sprint QA-review trial with useful-findings and cost measures.
Usable interfaces and integrations CLI/MCP/Lisp and a bounded installed client exist. Actual help failed readability; unfamiliar task completion and required tracker synchronization not qualified. Fix entry points/help needed for the two outcomes; wider gaps stay visible.
Operational durability and scale Some bounded restart/return evidence exists. Full backup/recovery, multi-node concurrency and target-scale evidence not established here. Relevant recovery only; no scale campaign.
Sidecat UI Installed task/progress/Note views and bounded observations exist. Own-identity room participation and integrated human decisions/return remain incomplete. Rowan delivers a runnable independently tested client for the selected journey.

Basis and limits

This table is a present assessment of evidence, not sixteen newly executed test verdicts. Source existence is not deployment, ordinary use is not full qualification, and lack of current proof is not a declaration that historical work never existed. Optional Jev work has retained source/evaluation history, but no current deployed route was verified; MiniMax activation is not selected.


Definitions recovered from architecture/system.md; architecture/specifications/product-area-maturity-backlog-and-sprint-planning.md; architecture/specifications/progressive-interface-documentation-and-maturity.md. The accepted version-1-contract supplies the sixteen product boundaries. Native S003 closeout and S004 selection retain the evidence and decisions. Historical subsystem grades are not copied as current node grades.

Projection sources

The shared brief is next-scrum-brief, recorded 7 October 2026 at 18:38:50 UTC. The maturity baseline is s004-capability-maturity, recorded at 18:38:52 UTC. Both are native Sidecat organization reference statements. The projection retains their content and normalizes heading depth and spacing for readability.

Source metadata and exact native content digests · Current progress snapshot